Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0325-00509
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/03/2025 | Commercial Mechanical Standard | APPROVED | Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 4/1/2025 11:08:33 AM |
||
| 04/04/2025 | Site Zoning Standard | APPROVED | |||
| 04/14/2025 | Water - PDSD Standard | APPROVED | |||
| 04/08/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 04/14/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/03/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Denied Reason: Date Completed : 4/2/2025 12:50:50 AM 1. General / Updates: For project updates, please submit sheets with all changes clearly marked in revision clouds. Please provide a written response to each comment; updates without a clear response may not be reviewed. If you have any questions regarding the comments, you may contact me directly. Updates may result in additional comments. 2. General / Special Inspections: Please have the Registered Design Professional in Responsible Charge of this project complete and return the City of Tucson Special Inspections Certificate with signatures. The form can be downloaded at: https://www.tucsonaz.gov/files/sharedassets/public/city-services/planning-developmentservices/documents/special_inspection_certificate.pdf 3. General / All sheets / Date of Engineer's Signature: The State of Arizona requires that the seal of a professional engineer must include the date that the drawings were signed. Please resubmit the structural construction documents (drawings and calculation package) with the "Date Signed" field filled in on the engineer's seal. 4. Sheet S1.3 / Note 1 / Special inspections: Per Note 1 on Sheet S1.3, "All field welding requires special inspection." Please revise the Statement of Special Inspections on Sheet S1.1 to include special inspection of field welding, as occurs. 5. Sheet S1.4 / Details 8 & 9 / CMU lintel schedule: Details 8 and 9 on Sheet S1.4 both include a CMU Lintel Schedule. However, the schedules conflict over the required depth of lintels at all openings. Please confirm which schedule controls and revise the drawings to be consistent. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 4/2/2025 11:51:05 AM |
||
| 04/03/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 3/31/2025 1:33:20 PM 1. E-201: Could not locate Key Notes 1, 2, 7, and 8. 2. E-203: Could not locate Key Notes 5, 6, 10, 13, 14, 15, and 22 for Bridge Detail #2. 3. E-400: Revise Electrical Load schedule should include new CO2 Booster Rack Demand load. Can use Demand load amps shown on Sheet E-401 Existing Panel MDP if that is the typical and non-continuous load. 4. E-401: Should be showing the existing KW load obtained from power company (do not need to use 125% value) as shown on sheet E-400, value of 127.63 KW. This added to your new loads is your new maximum estimated load for MDP. If it is over 800 amps you should replace/upgrad |
||
| 04/03/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 4/3/2025 12:16:14 AM First Plumbing Plan Review: 1). Plan Page P-101: Missing grease interceptor for prep room fixtures. Add a grease interceptor for the fixtures in the Prep room. -2018 IPC 1003.1 2). Plan Page P-102 or P-201: Missing Backflow device information. Add backflow device type, manufacturer name & model #. -2018 IPC 608.3 |
||
| 04/03/2025 | Outdoor Lighting Standard | REQUIRES RESUBMIT | Electrical(E) Reviewer Ron Ross rross@safebuilt.com Denied Reason: Date Completed : 3/31/2025 1:33:20 PM 1. E-201: Could not locate Key Notes 1, 2, 7, and 8. 2. E-203: Could not locate Key Notes 5, 6, 10, 13, 14, 15, and 22 for Bridge Detail #2. 3. E-400: Revise Electrical Load schedule should include new CO2 Booster Rack Demand load. Can use Demand load amps shown on Sheet E-401 Existing Panel MDP if that is the typical and non-continuous load. 4. E-401: Should be showing the existing KW load obtained from power company (do not need to use 125% value) as shown on sheet E-400, value of 127.63 KW. This added to your new loads is your new maximum estimated load for MDP. If it is over 800 amps you should replace/upgrad |
||
| 04/07/2025 | Fire New Construction Standard | REVIEW COMPLETED | The Carbon Dioxide System requires an operational permit from the Fire Department. The City of Tucson Adopted Fire Code is the 2024 IFC and not the 2021IFC. Additions to Fire Sprinklers or Fire Alarm System requires a separate permit. |
||
| 03/18/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |