Permit Number: TC-COM-0325-00509
Parcel: 10821018Y

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0325-00509
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/03/2025 Commercial Mechanical Standard APPROVED Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Approved
Reason:
Date Completed : 4/1/2025 11:08:33 AM
04/04/2025 Site Zoning Standard APPROVED
04/14/2025 Water - PDSD Standard APPROVED
04/08/2025 Site Engineering Standard NOT REQUIRED
04/14/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
04/03/2025 Commercial Building Standard REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Denied
Reason:
Date Completed : 4/2/2025 12:50:50 AM
1. General / Updates: For project updates, please submit sheets with all changes clearly marked in revision clouds.
Please provide a written response to each comment; updates without a clear response may not be reviewed. If you
have any questions regarding the comments, you may contact me directly. Updates may result in additional
comments.
2. General / Special Inspections: Please have the Registered Design Professional in Responsible Charge of this project
complete and return the City of Tucson Special Inspections Certificate with signatures. The form can be downloaded
at: https://www.tucsonaz.gov/files/sharedassets/public/city-services/planning-developmentservices/documents/special_inspection_certificate.pdf
3. General / All sheets / Date of Engineer's Signature: The State of Arizona requires that the seal of a professional
engineer must include the date that the drawings were signed. Please resubmit the structural construction documents
(drawings and calculation package) with the "Date Signed" field filled in on the engineer's seal.
4. Sheet S1.3 / Note 1 / Special inspections: Per Note 1 on Sheet S1.3, "All field welding requires special inspection."
Please revise the Statement of Special Inspections on Sheet S1.1 to include special inspection of field welding, as
occurs.
5. Sheet S1.4 / Details 8 & 9 / CMU lintel schedule: Details 8 and 9 on Sheet S1.4 both include a CMU Lintel Schedule.
However, the schedules conflict over the required depth of lintels at all openings. Please confirm which schedule
controls and revise the drawings to be consistent.





Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 4/2/2025 11:51:05 AM
04/03/2025 Commercial Electrical Standard REQUIRES RESUBMIT Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 3/31/2025 1:33:20 PM
1. E-201: Could not locate Key Notes 1, 2, 7, and 8.
2. E-203: Could not locate Key Notes 5, 6, 10, 13, 14, 15, and 22 for Bridge Detail #2.
3. E-400: Revise Electrical Load schedule should include new CO2 Booster Rack Demand load. Can use Demand load
amps shown on Sheet E-401 Existing Panel MDP if that is the typical and non-continuous load.
4. E-401: Should be showing the existing KW load obtained from power company (do not need to use 125% value) as
shown on sheet E-400, value of 127.63 KW. This added to your new loads is your new maximum estimated load for MDP. If it is over 800 amps you should replace/upgrad
04/03/2025 Commercial Plumbing Standard REQUIRES RESUBMIT Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 4/3/2025 12:16:14 AM
First Plumbing Plan Review:
1). Plan Page P-101: Missing grease interceptor for prep room fixtures. Add a grease interceptor for the fixtures in the Prep
room. -2018 IPC 1003.1
2). Plan Page P-102 or P-201: Missing Backflow device information. Add backflow device type, manufacturer name & model #. -2018 IPC 608.3
04/03/2025 Outdoor Lighting Standard REQUIRES RESUBMIT Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 3/31/2025 1:33:20 PM
1. E-201: Could not locate Key Notes 1, 2, 7, and 8.
2. E-203: Could not locate Key Notes 5, 6, 10, 13, 14, 15, and 22 for Bridge Detail #2.
3. E-400: Revise Electrical Load schedule should include new CO2 Booster Rack Demand load. Can use Demand load
amps shown on Sheet E-401 Existing Panel MDP if that is the typical and non-continuous load.
4. E-401: Should be showing the existing KW load obtained from power company (do not need to use 125% value) as
shown on sheet E-400, value of 127.63 KW. This added to your new loads is your new maximum estimated load for MDP. If it is over 800 amps you should replace/upgrad
04/07/2025 Fire New Construction Standard REVIEW COMPLETED The Carbon Dioxide System requires an operational permit from the Fire Department.
The City of Tucson Adopted Fire Code is the 2024 IFC and not the 2021IFC.
Additions to Fire Sprinklers or Fire Alarm System requires a separate permit.
03/18/2025 PDSD Application Completeness Express REVIEW COMPLETED