Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL REVISION v.2
Permit Number - TC-COM-0325-00503
Review Name: COMMERCIAL REVIEW - FULL REVISION v.2
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/17/2026 | Commercial Building Standard | APPROVED | Building (B) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 7/16/2026 |
||
| 07/17/2026 | Commercial Electrical Standard | APPROVED | Electrical (E) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 7/16/2026 |
||
| 07/17/2026 | Commercial Plumbing Standard | APPROVED | lumbing (P) Reviewer Andrew Bevis; abevis@safebuilt.com Discipline Status:Approved As Is Date Completed: 7/16/2026 |
||
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Historic | PENDING ASSIGNMENT | |||
| N/A | Water - PDSD Standard | PENDING ASSIGNMENT | |||
| 07/17/2026 | Commercial Mechanical Standard | REQUIRES RESUBMIT | Mechanical (M) Reviewer Jorge Valido; jvalido@safebuilt.com Discipline Status:Denied Date Completed: 7/17/2026 1.General -There areno Mechanical plans submitted for building 2330. 2.General -Provide Mechanical Minimum Design Criteria. Provide Mechanical plans for building 2330. Show on plans, (what applies) all new or existing to be relocated supply, return, exhaust and O/A ventilation duct work. Show on plans, all new, existing HVAC equipment (AHU, condensers, exhaust fans). Show on plans all termination points to the exterior of building. (exhaust, O/A ventilation). Provide equipment schedules. Provide details showing equipment tie down requirements, duct hanging detail, AHU detail in AHU closet and or suspended AHU design, penetrations for duct work and piping through Fire rated assemblies, Fire dampers in walls and or ceilings, (if applicable) duct smoke detector location. Provide O/A Ventilation schedule. Provide a roof plan. Show clear dimensions from all exhaust to O/A/Makeup air intakes. - 2024 IMC Section 601.5 Return Air Openings - 2024 IMC Section 403.3.1.1 - 2018 IECC Section C103.2Information on construction documents. - 2024 IBC Section [A]107.2.1Information on Construction Documents. RESUBMITTAL DIRECTIONS: •All corrections must be clouded, delta numbered, with a brief explanation within the plan sheet or the title block of the sheet. For corrections or revision to whole plan sheets, you need only cloud the sheet number and provide the delta identification number, with a brief explanation of the change(s). •As part of the resubmittal, please collate all revised sheets into the electronic document (PDF) and submit a complete and full plan set. We cannot accept individual sheets in response to review comments, since the entire plan set is required for approval and permitting. •Please include with the resubmittal a separate response narrative, which is numbered or itemized to correspond to each of the noted review comments items. •This response narrative must clearly address how each issue was corrected or resolved and indicate where the information may be found within the construction documents. The response narrative must be typewritten, on a letterhead noting the project name, with the Permit Application Number. Failure to provide this response narrative may result in review delays or rejection of the resubmittal. •Once all electronic construction documents (plan sheets, energy compliance certificates, reports, calculations, etc.) have been revised according to the above directions. Please resubmit the complete revised plan set with a separate copy of response narrative PDF through the municipality to complete the review. •Review of revised construction documents in response to this letter may take upwards of 5 (five) business days, depending on the size of the project and the volume of plans in queue at time of resubmittal. |
||
| 07/15/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |