Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Permit Number - TC-COM-0325-00493
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 10/16/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 10/16/2025 | Concrete Installation Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | SIC approval requires field report for approval (as provided for epoxy dowels). Please include field report and resubmit along with the SIC. | ||
| 10/16/2025 | Site Prep Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | SIC approval requires field report for approval (as provided for epoxy dowels). Please include field report and resubmit along with the SIC. | ||
| 10/15/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 10/16/2025 | Post-Installed Anchor Inspection (Deferred Submittal) Express | REVIEW COMPLETED |