Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.2
Permit Number - TC-COM-0324-00553
Review Name: COMMERCIAL REVIEW - LIMITED v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/16/2024 | Commercial Building | APPROVED | |||
04/15/2024 | Commercial Electrical | APPROVED | |||
04/17/2024 | Site Zoning | APPROVED | |||
04/16/2024 | Site Engineering | NOT REQUIRED | |||
04/18/2024 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
04/18/2024 | Commercial Mechanical | REQUIRES RESUBMIT | Please submit your revised documents along with a detailed response letter, which states how all Building Review Section comments were addressed. 1.Please amend plans to comply with Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration states that in addition to signing the seal, the registrant shall include the date the document was sealed. 2. Please provide air balance schedule with next submittal. IMC 403 & IMC 501.3 3. Please amend plans to show the condensate disposal routing on the drawings as well as a detail of the condensate termination. IMC 307 4. Please provide signed and dated COMheck report indicating code compliance for HVAC equipment IECC 503.1 Mark Masek Plans Examiner Mark.masek@tucsonaz.gov 520-837-4994 |
||
04/18/2024 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration states that in addition to signing the seal, the registrant shall include the date the document was sealed. 2. The Fixture Factor Value calculation on sheet P-2 calls for a 1” water meter. What is the size and location of the current water meter serving this suite? 3. Reduced pressure backflow prevention assemblies are required to be installed directly after the water meter for buildings that have food service facilities and are required to be installed in locations accessible to Tucson Water. Reference: Chapter XXVII, Article V, Section 27-72, the Tucson Code, https://www.tucsonaz.gov/files/sharedassets/public/city-services/tucson-water/water-quality/documents/backflow-ordinance.pdf 4. A separate submittal to PC Industrial Wastewater Control is required to verify that the public sewer will be protected from harmful discharges. Contact Lucinda.Hyatt@pima.gov for review and assessment. Reference: Section 1003.1, IPC 2018. |
||
04/05/2024 | Fire New Construction | REVIEW COMPLETED | |||
04/02/2024 | PDSD Application Completeness | REVIEW COMPLETED |