Permit Number: TC-COM-0324-00484
Parcel: 11628001L

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0324-00484
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/22/2024 Water - PDSD APPROVED
06/20/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
06/20/2024 External Reviewers - Stantec REQUIRES RESUBMIT April 10, 2024
1st Review

Seaver Franks Architects
Attn: Rick Huch/Hillary Grigel
2552 N. Alvernon Way
Tucson, Arizona 85712

Re: STAR PASS
NEW EGRESS PATH

City of Tucson Permit Number: TC-COM-0324-00484
Stantec Project Number: 185215066
Stantec File Number: TUC-24-033

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, structural, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
U V-B N/A N/A No No
Separate Permits: None.
Deferred Submittals: None.
Special Inspections: None.

ARCHITECTURAL COMMENTS

Sheet A0.0

1. The cover page indicates special inspections are required for earthwork, concrete, epoxy anchors, structural welding, and high-strength bolts. The scope of work indicated, and construction methods provided do not require the application of these special inspections. Please remove them from the cover page.

Sheet A2.1

1. Keynotes 14 and 15 are not located on the plans. Please revise with where these keynotes are located.

Sheet A2.2

1. Keynotes 14 and 15 are not located on the plans. Please revise with where these keynotes are located.

STRUCTURAL COMMENTS

There are no comments.

MECHANICAL COMMENTS

There are no comments.

PLUMBING COMMENTS

There are no comments.

ELECTRICAL COMMENTS

Sheet E1.0

1. Please provide a statement that special inspection is required (or is not required) per Sec. 104.2.2. of the 2012 City of Tucson/Pima County Outdoor Lighting Code.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
04/22/2024 Site Engineering REQUIRES RESUBMIT See zoning comment
04/19/2024 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
TC-COM-0324-00484
3800 W STARR PASS BL BLDG 1 – PAD-9
Construct New Egress Path from the resort and spa to the existing golf course. New concrete exterior stairwell, new DG path & landscaping. ( 1st Review)

TRANSMITTAL: April 19, 2024
1. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
03/21/2024 PDSD Application Completeness REVIEW COMPLETED