Permit Number: TC-COM-0324-00453
Parcel: 119421840

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-0324-00453
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
05/29/2024 Water - PDSD APPROVED
05/29/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
05/28/2024 External Reviewers - SAFEBuilt REQUIRES RESUBMIT Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 4/6/2024 12:14:11 AM

Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 4/2/2024 5:09:52 PM


Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Approved
Reason:
Date Completed : 5/24/2024 9:22:06 AM
1. (RESOLVED) - Plan sheet M-4.1 - Rooftop HVAC Unit Schedule states RTU #1 under MIN OA (CFM) 510 CFM. Outside Air Schedule under Required Outside Air (CFM) total OA CFM for RTU #1 equals 527 CFM. Other RTU do not match OA requirements. Confirm all OA CFM quantities for al RTU - 2015 IBC Section [A]107.2.1Information on construction documents.

2. (RESOLVED) - Plan sheet M-4.1 - Rooftop HVAC Unit Schedule states RTU #2 under Air Flow (CFM) 2475 CFM. Total SAD (supply air drops) CFM quantity for RTU #2 on Plan Sheet M-2.1 equals 2295 CFM. Confirm CFM quantities for RTU #2 - 2015 IBC Section [A]107.2.1Information on construction documents.

3. (RESOLVED) - Plan sheet M-4.1 - Rooftop HVAC Unit Schedule states RTU #4 under Air Flow (CFM) 2225 CFM. Total SAD (supply air drops) CFM quantity for RTU #4 on Plan Sheet M-2.1 equals 1980 CFM. Confirm CFM quantities for RTU #4 - 2015 IBC Section [A]107.2.1Information on construction documents.

4. (RESOLVED) - Plan Sheet M-5.1 - Confirm the CFM on the Mechanical Compliance Certificate. Confirm the stated Constant Volume CFM for RTUs #2 and #4 - 2015 IBC Section [A]107.2.1Information on construction documents.


Electrical(E) Reviewer
Ron Ross
rross@safebuilt.com
Approved
Reason:
Date Completed : 3/26/2024 6:12:14 PM


Plumbing(P) Reviewer
Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 5/27/2024 11:06:30 PM
Second Plumbing Review: Comment 3 remains
Resolved_1). Sheet P-6.1:The gas code and selected needs to derive from the current adopted gas code. Add the current adopted gas code & sizing table to the gas load summary in accordance with -2018 IFGC 402.3

Resolved_2). Sheet P-5.1: The detail page is missing a detail that properly depict the installation of the SEP-1 lift tank & pump connections & vent. Add a lift pump/tank detail in accordance with -IPC 712.2, 712.3.2

Un-resolved- 3). General: Provide age range of the children to to determine the fixture spacing complies with -2009 ICC A117.1 **NO Response**
04/26/2024 PDSD Application Completeness REVIEW COMPLETED