Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0324-00453
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/24/2024 | Site Zoning | APPROVED | |||
04/24/2024 | Site Engineering | NOT REQUIRED | |||
04/24/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
04/10/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 4/6/2024 12:14:11 AM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 4/2/2024 5:09:52 PM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 4/8/2024 7:05:28 PM 1. Plan sheet M-4.1 - Rooftop HVAC Unit Schedule states RTU #1 under MIN OA (CFM) 510 CFM. Outside Air Schedule under Required Outside Air (CFM) total OA CFM for RTU #1 equals 527 CFM. Other RTU do not match OA requirements. Confirm all OA CFM quantities for al RTU - 2015 IBC Section [A]107.2.1Information on construction documents. 2. Plan sheet M-4.1 - Rooftop HVAC Unit Schedule states RTU #2 under Air Flow (CFM) 2475 CFM. Total SAD (supply air drops) CFM quantity for RTU #2 on Plan Sheet M-2.1 equals 2295 CFM. Confirm CFM quantities for RTU #2 - 2015 IBC Section [A]107.2.1Information on construction documents. 3. Plan sheet M-4.1 - Rooftop HVAC Unit Schedule states RTU #4 under Air Flow (CFM) 2225 CFM. Total SAD (supply air drops) CFM quantity for RTU #4 on Plan Sheet M-2.1 equals 1980 CFM. Confirm CFM quantities for RTU #4 - 2015 IBC Section [A]107.2.1Information on construction documents. 4. Plan Sheet M-5.1 - Confirm the CFM on the Mechanical Compliance Certificate. Confirm the stated Constant Volume CFM for RTUs #2 and #4 - 2015 IBC Section [A]107.2.1Information on construction documents. Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 3/26/2024 6:12:14 PM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 4/9/2024 9:20:42 PM First Plumbing Review: 1). Sheet P-6.1:The gas code and selected needs to derive from the current adopted gas code. Add the current adopted gas code & sizing table to the gas load summary in accordance with -2018 IFGC 402.3 2). Sheet P-5.1: The detail page is missing a detail that properly depict the installation of the SEP-1 lift tank & pump connections & vent. Add a lift pump/tank detail in accordance with -IPC 712.2, 712.3.2 3). General: Provide age range of the children to to determine the fixture spacing complies with -2009 ICC A117.1 |
||
04/24/2024 | Water - PDSD | REQUIRES RESUBMIT | Provide the size of the water meter serving this building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018. | ||
04/14/2024 | Fire New Construction | REVIEW COMPLETED | |||
03/25/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |