Permit Number: TC-COM-0324-00444
Parcel: 112054130

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0324-00444
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
04/11/2024 Commercial Mechanical NOT REQUIRED
04/01/2024 Fire New Construction NOT REQUIRED
04/15/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
04/15/2024 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

1 Ref; Plan Sheet E-201. (a) The electrical Utility does not provide commercial 3 phase service secondary conductors. Please indicate on the electrical line diagram conduit, conductors, types, sizes and quantities for the electrical service secondaries.

(b) Indicate feeder conduit, conductor sizes, types and quantities for the primary and secondary feeders to Transformer ‘SD-XR’.

(c) Provide a complete Fault Current Analysis and AIC ratings for all electrical equipment downstream of the Electrical Service.

(d) Provide for a Supply Side PV Output Interconnection at the service equipment or provide for a GFI equipped backfed circuit breaker and coordinate tripping current with the GFI equipped Main service Breaker. NEC 705.32, 240.32.

2. Provide complete compliance with the 2012 City of Tucson Outdoor Lighting Code (OLC) for the exterior lighting. Review section 104 and provide evidence on the site lighting plan that the proposed lighting along with all existing lighting on the parcel complies with this Code. Be advised that the maximum exterior light source color temperature cannot exceed 3500K, per section 402.1 OLC.

3. Please provide Manufacturer Specifications or cut sheets for the Level 2 and Super EV chargers.

4. A sperate sign permit will be required for the TESLA canopy sign.

Ref; 2018 IBC section 107.2.1, 2017 NEC, 2012 City of Tucson Outdoor Lighting Code.
04/12/2024 Commercial Structural REQUIRES RESUBMIT Please submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed.

1. Sheet SS-00: Please amend plans to update State and California Code references to the 2018 International Building Code and 2017 NEC. IBC 107.2.1Treat as typical note

2. Please provide Geotechnical Report prepared by Terracon and dated 07/13/2023, with the next submittal IBC 107.2.1



Mark Masek

Plans Examiner

Mark.masek@tucsonaz.gov

520-837-4994
04/09/2024 Site Engineering REQUIRES RESUBMIT See zoning comment
04/03/2024 Site Zoning REQUIRES RESUBMIT FROM: PDSD Zoning Review

PROJECT: TC-COM-0324-00443 & TC-COM-0324-00444
2956 N CAMPBELL AV. – C-1
EV Charging Stations & Solar Canopy (3rd Review)

TRANSMITTAL DATE: April 3, 2024

Please resubmit revised drawings with a detailed response letter stating how all Zoning Review Section comments were addressed.

The site is in the C-1 zone (UDC 4.7.20).

1. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved prior to approval of this building plan. The Administrative Manual can be found at: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Codes-and-Plans/Zoning-Code#section-1.

If you have any questions about this transmittal, contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov.
.
03/12/2024 PDSD Application Completeness Express REVIEW COMPLETED