Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - LIMITED v.1

Permit Number - TC-COM-0324-00425
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/26/2024 Commercial Electrical APPROVED
03/28/2024 Site Zoning APPROVED
03/18/2024 Site Engineering NOT REQUIRED
04/02/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
04/02/2024 Commercial Building REQUIRES RESUBMIT Please submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed.

Sheet A1: Please amend and update the edition of the governing codes under General Notes to reflect the 2018 edition of the I-codes and the 2017 edition of the NEC. IBC 107.2.1 Additionally please include the 2018 IEBC.

Sheet A1: Please amend plans to include a detailed description of the work involved in this permit’s scope. IBC 105.3 Based on available permitting history, these containers were Storage units #7&8.

Sheet A1: Please provide the Soils Report #63155017 by Terracon Dated May 19, 2015, with the next submittal. IBC 107.2.1

Sheet A2: Please amend plans to indicate the following: IBC 107.2.1

Door size for new opening in larger container.

Show door landing for above door.

Indicate tempered glazing in window next to above door.

Indicate the SHGC and the U-Factor for the new windows installed in the larger container.

Sheet A2: Sheet A4: Please amend plans so all documents show the same information. Sheet A4 indicates a Type II hood and Sheet M2 depicts a Type I hood. Please resolve. IBC 107.2.1



Mark Masek

Plans Examiner

Mark.masek@tucsonaz.gov

520-837-4994
04/02/2024 Commercial Mechanical REQUIRES RESUBMIT 1. Specify the type of venting system and the venting materials to be used for the proposed water heater. Reference: Section 503.1, IFGC 2018.
2. The Type II hood has 800 CFM of exhaust while the make-up air unit, MUA-1 provides 640 CFM. Show how adequate make-up air is to be provided to the room so that the room pressure remains essentially neutral. Reference: Section 501.4, IMC 2018.
3. Provide locking access port caps for the condensing unit per Section 1101.10, IMC 2018 or locate the condensing unit in a controlled
04/02/2024 Commercial Plumbing REQUIRES RESUBMIT Correct the description of equipment tag #16 as shown in the Low Pressure Propane Load chart. It is a gas-fired, double convection oven, not a “burner stove.”
04/02/2024 Water - PDSD REQUIRES RESUBMIT Show the location and size of the existing water meter, backflow preventer, and the water service pipe on a site plan. Reference: Section 107.2.1 and 107.2.6, IBC 2018.
03/25/2024 Fire New Construction REVIEW COMPLETED
03/14/2024 PDSD Application Completeness REVIEW COMPLETED