Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0324-00403
Parcel: 12217278F

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0324-00403
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/05/2024 Site Engineering APPROVED Shared Studio Session on 192-616-514 Master Permit TC-COM-0224-00249.
03/06/2024 Site Zoning APPROVED Shared Studio Session on 192-616-514 Master Permit TC-COM-0224-00249.
03/11/2024 Water - PDSD APPROVED Shared Studio Session on 192-616-514 Master Permit TC-COM-0224-00249.
03/11/2024 Commercial Plumbing NOT REQUIRED Shared Studio Session on 192-616-514 Master Permit TC-COM-0224-00249.
03/11/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
03/06/2024 Commercial Electrical REQUIRES RESUBMIT Shared Studio Session on 192-616-514 Master Permit TC-COM-0224-00249.
Scope #2

Please address the electrical plan review comments and provide a written response.

1 The ‘Index of Drawings’ on the cover plan A0.0 for the ‘SCOPE 2 BID PACKAGE’ shows 12 Electrical Drawings E1.1 -thru- E4.3. The electrical plans submitted are only 4 plans. Please clarify.

2 The panel schedule shows new panel ‘A4’ utilizing a series rated system. Please provide for signage on the plans as required per NEC 110.22(B)and (C) as applicable.

Ref; 2018 IBC section 107.2.1, 2017 NEC.
03/11/2024 Commercial Mechanical REQUIRES RESUBMIT Shared Studio Session on 192-616-514 Master Permit TC-COM-0224-00249.
1. Revise the mechanical plans on sheet M2.1 to differentiate between supply and return ducts. Reference: Section 107.2.1, IBC 2018.
2. Identify the type of projection equipment (e.g. electric arc, Xenon, etc.). Verify that the exhaust airflow rate complies with Section 502.11, IMC 2018.
03/06/2024 Commercial Structural REQUIRES RESUBMIT TC-COM-0324-00403 Scope 2
3233 E SPEEDWAY BL TUCSON, AZ 85716

New Screen Cinema Addition: Future Screen 4 (Shell Only)

Please submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Additional comments may be generated after the below comments are addressed.
1. Sheet A0.0: Please amend Code Information to include all applicable codes as amended by the City of Tucson. IBC 107.2.1 For example, in addition to the 2018 IBC please add the following.
• 2018 International Existing Building Code (IEBC)
• 2009 ICC A117.1 Accessibility Code (by reference)
• 2018 International Mechanical Code (IMC)
• 2018 International Plumbing Code (IPC)
• 2017 National Electrical Code (NEC) • 2018 International Fire Code (IFC)
• 2018 International Fuel Gas (IFGC)
• 2018 International Energy Conservation Code (IECC)
• City of Tucson/Pima County Outdoor Lighting Code
• Local Amendments to Above Codes ( www.tucsonaz.gov/pdsd/building-codes )

2. Sheet A0.0: Please amend plans to include all sheets in the sheet index as Sheets E2.1 through E4.3 are missing from the plan set, with two sheets labeled as E2.1. One is the Fire Alarm Specs and the other is Feeder Diagram. Please resolve this inconsistency. IBC 107.2.1

3. Sheet A0.0: Please amend plans to add notes indicating deferred submittal items are not to be installed until approved. IBC 107.3.4.1

4. Sheet A0.0: Please amend plans to name Registered Design Professional in Responsible Charge, with contact info. IBC 107.3.4

4a. Further, related to the comment above, please have the Registered Design Professional in Responsible Charge of this project complete and return the City of Tucson Special Inspections Certificate.

5. Sheet A0.0: Please amend the Code Review to indicate the type of Fire Sprinkler system, Fire alarm, and if Emergency voice/alarm communication is specified IBC 107.2.1

6. Sheet A0.0: Please amend the Code Review to include all the occupancy classifications contained in the scope of this project. IBC 107.2, IBC 302.1 For example, storage areas, etc.
7. Sheet A0.0: Please amend plans to identify the mixed occupancy methodology as either accessory, nonseparated, separated, or a stated combination of types. IBC 508.1
8. Sheet A0.0: Please amend Code Review to include all buildings and connecting structure as one building in the code analysis. Alternately, if separate buildings are proposed, please Clarify method of building analysis used to comply with Chapter 5 for existing separation wall. Where fire-resistance wall separation is required, amend plans to indicate the existing fire-rating of the partition wall or provide new and cross-reference assembly detail. For new fire-rated assemblies, provide construction details with basis of approval by one of the following:
A. Listing number approved by third-party testing agency (i.e., UL, GA)
B. Item number for prescriptive fire-resistive assembly under IBC Table 721.1(2)
C. Prescriptive assembly constructed under IBC 722.6.

9. Sheet A0.0: Further, related to the comment above please show how these walls comply with IBC 706.2 regarding structural stability, as it appears the new construction is connected to the existing construction. For example, Fire walls shall be designed and constructed to allow collapse of the structure on either side without collapse of the wall under fire conditions. Fire walls designed and constructed in accordance with NFPA 221 shall be deemed to comply with this section.

10. Please amend plans to show the method of compliance with IECC C401.2. For example: COMcheck.

11. Please amend plans to provide U-Factors, and SHGC for fenestration. IECC C402.1.


14. Sheet A1.1: Please amend plans to show the wall type, fire-resistance rating, and basis of approval for the elevator shaft walls. IBC 3002.1, IBC 713.2 For example, are the walls CMU or Frame

15. Sheet A1.2: Please amend plans to ensure the following.
1. All spaces are labeled with a name or further description as needed to adequately convey the intended purpose (use) or the multiple uses of the space. IBC 302.1 For example, what is the use of Room #113 Support?
2. All spaces are labeled with their occupancy classification or classifications. Blanket labels of multiple spaces are acceptable if the differing occupancies are specifically labeled. IBC 302.1, 508.1

16. Sheet A1.7: Sheet A1.7: Please amend plans to indicate the size as well as the calculations used to size the roof drains and overflow system. IBC 107.2.1

17. Sheet A3.7: Please amend plans to provide the rise and run for the stairs and additionally provide construction details and drawings including connections, headroom clearance, stairway and landing dimensions, and show enclosed usable space below stairways are protected by fire-rated construction. IBC 107.2.1, IBC 1011.7.3

18. Please amend plans to provide details for penetrations at any floor penetrations, etc. IBC 718.2.5, IBC 714.6.1


Accessibility

19. Please amend plans to provide the following regarding accessibility elements associated with this construction.

20. Please amend the plans to show at least one accessible route within the site from public transportation stops, accessible parking, accessible passenger loading zones, and public streets or sidewalks to the accessible building entrance served. IBC 1104.1, 1104.2, ICC A117.1 Chapter 4


Structural

22. Scope 1 Calculations: Please amend calculations to provide a page index. IBC 107.2.1

23. Scope 1 Calculations: Please provide calculations for the support of the new opening in the masonry wall as shown in wall section 2 sheet A4.1 IBC IBC 107.2.7

24. Scope 1 Calculations: Plan reviewer was unable to find stairway structural design calculations, please provide or indicate to plan reviewer where these can be found. IBC 107.2.7
a. Additionally, please provide structural plans to include all connections for stairways.

31. Scope 1 Calculations: Plan reviewer was unable to find structural, design and calculations for the elevator shaft walls and openings. Steel frame was shown, but not shaft wall construction. Please provide or indicate to plan reviewer where these can be found. IBC 107.2.7

Mark Masek
Plans Examiner
Mark.masek@tucsonaz.gov
520-837-4994
03/05/2024 Fire New Construction REQUIRES RESUBMIT Shared Studio Session on 192-616-514 Master Permit TC-COM-0224-00249.
-Resolve all building comments. -Indicate if bulk CO2 for beverage dispensing will be used. If being used, show location of CO2 dewar and indicate CO2 gas detection alarm will be installed (deferred submittal). -List occupant load for all buildings and occupiable spaces in the code analysis, including outdoor theatre area. Fire alarm requirements will be based on OL. Include type of fire alarm in the code analysis. john.vincent@tucsonaz.gov 5203495581
03/04/2024 PDSD Application Completeness REVIEW COMPLETED Shared Studio Session on 192-616-514 Master Permit TC-COM-0224-00249.