Permit Number: TC-COM-0323-00936
Parcel: 13105020A

Review Status: Requires Resubmit

Review Details: COMMERCIAL PDSD SIMPLE REVIEW v.1

Permit Number - TC-COM-0323-00936
Review Name: COMMERCIAL PDSD SIMPLE REVIEW v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/21/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/21/2024 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.

1 Ref; Plan sheet #3. Equipment Schedule Notes # 4 description, # does not correlate with the equipment.

2 Ref; Feeders installed in parallel must be identical to each other, NEC 310.10(H).

3 Due to the revised configuration of the Electrical Main Service Disconnecting means, the Grounding electrode conductor termination at the service must be relocated from the existing service CT can to the new 400 amp service disconnect switch and be terminated at the same terminal in which the grounded service conductor is terminated. NEC 250.24(A)(1). All neutral and equipment grounding conductors downstream of the Mian service disconnect shall be isolated from each other.

Also please make corrections to plan sheet #4. For comment #1 and #2 and #3.

Ref; 2018 IBC section 107.2.1, 2017 NEC
03/11/2024 PDSD Application Completeness Express REVIEW COMPLETED