Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0323-00932
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
06/15/2023 | Water - PDSD | APPROVED | |||
05/31/2023 | Site Engineering | NOT REQUIRED | |||
11/13/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
11/13/2023 | External Reviewers - Stantec | REQUIRES RESUBMIT | All comments were addressed, however Stantec's fees were not paid. Requests for payment were made to the applicant on June 21, 2023, July 7, 2023, and July 19, 2023. Stantec withheld approval for lack of payment. | ||
07/06/2023 | Site Zoning | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-COM-0323-00932 845 E. Ohio St. – I-1 Tuning Existing Office Space to New Marijuana Dispensary Off-site Manufacturing Location (1st Review) TRANSMITTAL DATE: May 30, 2023 COMMENTS: Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in I-1 (UDC Article 4.7.29). Marijuana Dispensary Off-site Manufacturing Location is a permitted use in the zone (UDC Table 4.8-5), subject to Use Specific Standards 4.9.9.E.2 and 4.9.13.Q. 1. COMMENT: Clearly demonstrate how the requirements of UDC Article 4.9.9.E.2.k are met. 1.a. Clarify the design of the proposed carbon filtration systems for each room and show the installation of the equipment on the construction drawings. 1.b. Provide for an evaluation period to determine the best replacement schedule for the carbon filters to avoid odor breakthrough. If you have any questions about this transmittal, please contact Nicholas Martell at Nicholas.Martell@tucsonaz.gov. |
||
06/07/2023 | Fire New Construction | REVIEW COMPLETED | |||
05/15/2023 | PDSD Application Completeness | REVIEW COMPLETED |