Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0323-00907
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/05/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
07/05/2023 | Commercial Mechanical | REQUIRES RESUBMIT | The registrant shall sign the seal. [Initial comment: Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration states that the registrant shall sign the seal and include the date the document was sealed.] | ||
07/05/2023 | Commercial Plumbing | REQUIRES RESUBMIT | 1. The registrant shall sign the seal. [Initial comment: Section R4-30-304 of the Rules of the Arizona State Board of Technical Registration states that the registrant shall sign the seal and include the date the document was sealed.] 2. If the detail is “not needed at this site”, remove it. [Initial comment: Detail 3/P501 shows the installation of a reduced pressure backflow preventer. Where does this occur? Reference: Section 107.2.1, IBC 2018.] 3. The specified water heater is not a condensing water heater and may not use a PVC flue. Show the installation of the water heater in conformance with the manufacturer’s installation instructions. Note: the natural gas input is 40 MBH. [Initial comment: The specified water heater was discontinued in 2012. Provide a specification for a water heater that can be installed. Verify that the installation of the specified water heater conforms to the manufacturer’s installation instructions. Reference: Section 107.2.1, IBC 2018. ] 4. The use of ASHRAE 90.1 was not noted on the drawings but may be used provided ASHRAE 90.1-2016 is used for all of the energy compliance items (i.e. building, mechanical, service water, power, and lighting). Note that the mechanical drawings are using the 2012 edition of the IECC instead of the 2018 edition of the IECC. [Initial comment: Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018 (i.e. 24” for ½” supply pipe).]. 5. The comment is not resolved, the detail is still incorrect. [Initial comment: If the manufacturer does not incorporate a sediment trap within the gas-fired equipment, provide a sediment trap downstream of the appliance shut off valve, as close to the equipment as possible (e.g. the rooftop unit). Reference: Section 408.4, IFGC 2018.] 6. The comment is not resolved, the detail is still incorrect. [Initial comment: Revise the configuration of the natural gas sediment trap, as shown in detail 8/P501, to comply with the requirements of Section 408.4, IFGC 2018 (i.e. the trap is to be in the bottom opening of the run of the tee, not in the branch of the tee).] |
||
06/06/2023 | PDSD Application Completeness | REVIEW COMPLETED |