Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0323-00906
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/01/2023 | External Reviewers - SAFEBuilt | APPROVED | Activity Number: TC-COM-0323-00906 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditinally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Approved MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Conditionally Approved E-602 PANEL SCHEDULES: 125-amp Bus rating for LP1 section 2 is not sufficient for panel. Needs to be fully rated at 400 amps when connected with feed thru lugs. As Panel LP1 is new, it also needs to call out the minimum KAIC rating required. Response: All panels are existing to remain. The panel schedules shown are for reference only of existing conditions per previous as-builts. The bus for LP1 section 2 is 400A, and has been revised. See Revision #3 sheet E602. Reviewer response. Revised set had no such correction. However, response does state that this is an existing panel and is actually 400 Amp. PLUMBING REVIEW COMMENTS: Conditionally Approved Second Plumbing Review: OK Subject to Field Inspections 1). OK 2). OK If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
05/01/2023 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
04/26/2023 | PDSD Application Completeness | REVIEW COMPLETED |