Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0323-00865
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
07/31/2023 | Commercial Structural | APPROVED | |||
08/01/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
08/01/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1. Please provide a electrical lighting plan showing all new or relocated luminaires, switching and branch circuit requirements. Include the new or relocated exhaust fans and controls either in the lighting or power plan. 2. Provide a complete panel schedule for the new panel including an accurate description in the panel directory for each branch circuit. NEC 408.4 3. Provide complete electrical load calculations for the service serving this project. 4. Provide Tamper resistant receptacles for any new or relocated 120 volt receptacles. NEC 406.12. 5. Provide compliance with the 2018 IECC for the lighting if applicable. Ref; 2018 IBC section 107.2.1, 2017 NEC, 2018 IECC. |
||
07/27/2023 | Commercial Mechanical | REQUIRES RESUBMIT | Show how installation of the two dryers complies with Section 504.6, IMC 2018 for make-up air. | ||
07/27/2023 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Provide a lavatory for the toilet room in classroom 109. Reference: Section 405.3.2, IPC 2018. 2. Provide metering faucets for the new and relocated lavatories per Section 412.11, IPC 2018, as amended by the City of Tucson. 3. Show how the distance from the hot water source (e.g. a hot water recirculation loop) to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. 4. Provide structural calculations for installing the water heater on a wall-mounted shelf to verify that the wall can safely support load. Reference: Section 301.2, IPC 2018. |
||
06/28/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |