Permit Number: TC-COM-0323-00826
Parcel: 115190150

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0323-00826
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
06/08/2023 Commercial Structural APPROVED
06/08/2023 Bldg Permits - Post Review Express PENDING ASSIGNMENT
06/01/2023 Commercial Electrical REQUIRES RESUBMIT 1 Provide a directory(s) as required per NEC 690.129D), 705.10.

2 Provide for the bonding to the Grounding Electrode System at the building where the PV array is installed, per NEC 690.47.

3 Identify the service in the electrical line diagrams.

4 Identify all the buildings associated with the rooftop PV arrays on all the plans.

5 It appears there are a total of 3 PV arrays on the larger Building roof. 2 arrays identified as ‘MP01’ ‘MP02’ associated with the larger building electrical service PV interconnection (Permit # TC-COM-0323-00825), and the third array on the same roof associated with the Main Office electrical service PV interconnection identified as ‘MP01’ (Permit # TC-COM-0323-00826). For clarity, please do not have multiple arrays on a single building that are associated with different service interconnections on the premises with the same Nomenclature. For example; maybe call the 3rd array ‘MP03’. Also, for clarity, Identify or label the PV equipment and the PV Dedicated Overcurrent Device utilized for the PV Interconnection so as to associate it with the corresponding PV system, NEC 690.56, 705.10.

Ref 2018 IBC section 107.2.1, 2017 NEC
05/05/2023 Fire New Construction REQUIRES RESUBMIT -Provide pathway around the entire perimeter. All four sides.
john.vincent@tucsonaz.gov
5203495581
05/04/2023 PDSD Application Completeness Express REVIEW COMPLETED