Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0323-00825
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/31/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/31/2023 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan revie comments and provide a written response. 1. Per the response letter submitted; Item #4 states, "Interconnection changed to Line side Tap”. The line diagrams show a load side interconnection via a back fed circuit breaker. Please clarify. 2. As requested. Identify the building that the PV arrays are installed. Also identify the building electrical service on the line diagrams. Ref; 2018 IBC section 107.2.1, 2017 NEC. City of Tucson Commercial Electrical Plan Submittal Requirements. |
||
| 07/12/2023 | Fire New Construction | REQUIRES RESUBMIT | Provide perimeter pathways in accordance with IFC 2018, 1204.3.1 | ||
| 06/28/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |