Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0323-00817
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/11/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
05/11/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0323-00817 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Conditionally Approved NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. BUILDING REVIEW COMMENTS: Denied 1. Sheet A0.0: The occupant load/plumbing fixture calculations provided are incorrect. The International Building Code (IBC) does not base the requirements for occupant load calculations on proposed employees on shift. A space-byspace occupant location is required. Provide an accurate and complete occupant load calculation in accordance with Section 1004.3 and Tale 1004.5. NOTE: Proposed shift occupants is not a concept established by the IBC in regards of occupant load calculations, as policies and shifts may change over time. The foundational principles of occupant load calculations are founded in maximum simultaneous occupancy of the structure. This is the conservative approach the permits the deviation of policy and shifts. Any deviation from the prescriptive requirements of calculating occupant loads is considered an alternate means and methods and would be required to be approved by the building official. MECHANICAL REVIEW COMMENTS: Conditionally Approved Approved/subject to field approval ELECTRICAL REVIEW COMMENTS Approved PLUMBING REVIEW COMMENTS: Denied Second Plumbing Review: 1). SAME- Need to address Bldg. plan review comment # 1 -IPC 403.1 2). OK 3). OK 4). OK - Floor drain trap seal protection subject to Field inspections If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
04/26/2023 | PDSD Application Completeness | REVIEW COMPLETED |