Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0323-00758
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/30/2023 | Site Zoning | APPROVED | |||
04/04/2023 | Site Engineering | NOT REQUIRED | |||
04/07/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
03/29/2023 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Activity Number: TC-COM-0323-00758 GENERAL: Provide written responses to all review comments. Provide a complete plan set. Provide additional documents as requested by review staff. STRUCTURAL REVIEW COMMENTS: Denied 1) Provide the allowed vs actual area, height, and number of stories calculations. Include the deferred submittals and the list of special inspections (not specified on page S1.1) on the cover page. 2) Include the use of the adjacent space and fire separation details as required by Table 508.4. BUILDING REVIEW COMMENTS: Denied 1) Provide the allowed vs actual area, height, and number of stories calculations. Include the deferred submittals and the list of special inspections (not specified on page S1.1) on the cover page. 2) Roof water drainage details not shown. 3) Show the toilet room fixture clear spaces, dimensions, and that doors are not in the required spaces and turning radius as detailed in Sections 305, 603, and 606 of the Accessibility code ICC A117.1. Show the urinal space dimensions. 4) Need the kitchen equipment and grease interceptor spec sheets. Verify the specs include the information needed to determine the requirements of the space under the hoods, dimensions and spacing, BTUs, etc. 5) Detail the use of the adjacent unit use and fire separation as required by Table 508.4. MECHANICAL REVIEW COMMENTS: Denied 1) Need the kitchen equipment and grease interceptor spec sheets. Verify the specs include the information needed to determine the requirements of the space under the hoods, dimensions and spacing, BTUs, etc. ELECTRICAL REVIEW COMMENTS Denied 1) Receptacles for the exterior and roof equipment not shown. 2) Electrical floor plans show panels C and Das new but the electrical diagram states they are existing. PLUMBING REVIEW COMMENTS: Denied 1) The third toilet room fixtures are not included in the plumbing floor plans, diagrams, and plumbing fixture calculations. Include the condensate drains and rooftop units in the gas and plumbing calculations and diagrams. Verify all piping details on the diagrams have the fixture served labeled. 2) Roof water drainage details not shown. 3) Show the toilet room fixture clear spaces, dimensions, and that doors are not in the required spaces and turning radius as detailed in Sections 305, 603, and 606 of the Accessibility code ICC A117.1. Show the urinal space dimensions. 4) Provide spec sheets for the water heater and grease interceptor. If you require additional clarification regarding these comments, please contact Doris Benoit at doris.benoit@tucsonaz.gov |
||
04/07/2023 | Fire New Construction | REVIEW COMPLETED | |||
03/14/2023 | PDSD Application Completeness | REVIEW COMPLETED |