Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0323-00742
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
04/04/2023 | Commercial Electrical | APPROVED | |||
03/22/2023 | Site Zoning | APPROVED | |||
03/24/2023 | Site Engineering | NOT REQUIRED | |||
04/18/2023 | Bldg Permits - Post Review | PENDING ASSIGNMENT | |||
04/05/2023 | Commercial Mechanical | REQUIRES RESUBMIT | A restaurant has different ventilation and exhaust requirements than a karate studio (ATA Black Belt Academy). Provide a mechanical design and calculations performed by an Arizona registrant who has demonstrated proficiency through registration, education, technical knowledge, or experience to perform such work. Reference: Sections 107.1 and 107.2.1, IBC 2018 | ||
04/05/2023 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Revise the scope of work on sheet S-1 and the plumbing fixture unit table on sheet P-1 to reflect the actual project. The suite being modified was never the Beef Master Meat Market and it does not appear that it is intended to be used as a massage parlor. Reference: Section 107.2.1, IBC 2018. 2. Show the location of the existing water meter, backflow preventer, and the water service pipe on the site plan as noted on sheet P-1. Provide the size of the water meter serving this suite, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1 and 107.2.6, IBC 2018. 3. Provide a plumbing design and calculations performed by an Arizona registrant who has demonstrated proficiency through registration, education, technical knowledge, or experience to perform such work. Reference: Sections 107.1 and 107.2.1, IBC 2018. |
||
04/18/2023 | Commercial Structural | REQUIRES RESUBMIT | 1) Provide a complete code analysis to include occupancy classification, type of construction, sprinklered or not, occupant load, and total square footage. 2) Provide plumbing fixture requirement calculation 3) Provide an enlarged bathroom plan that shows all dimensions and clear floor spaces. 4) Provide complete egress plan. 5) Provide written responses to all review comments. |
||
03/15/2023 | Fire New Construction | REQUIRES RESUBMIT | -Provide code analysis, including occupancy type, occupant load, sprinkler system, alarm system, etc, etc... -Provide exiting plan. |
||
03/13/2023 | PDSD Application Completeness | REVIEW COMPLETED |