Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Permit Number - TC-COM-0225-00404
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 11/06/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 11/06/2025 | Air Balancing/Commissioning Report (Deferred Submittal) Express | REQUIRES RESUBMIT | The air balance report shows that the total air flowrate for AC-3 is still approximately 76% of the design value after two attempts to rectify the problem. Submit the air balance report to the engineer to determine a plan to resolve the impasse. | ||
| 11/06/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |