Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0225-00389
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/10/2025 | Commercial Building Standard | APPROVED | |||
| 03/11/2025 | Commercial Electrical Standard | APPROVED | |||
| 03/19/2025 | Commercial Mechanical Standard | APPROVED | |||
| 03/10/2025 | Commercial Structural Standard | APPROVED | |||
| 02/27/2025 | Outdoor Lighting Standard | APPROVED | |||
| 03/18/2025 | Site Zoning Standard | APPROVED | |||
| 03/19/2025 | Water - PDSD Standard | APPROVED | |||
| 03/28/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 03/28/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/19/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Clarify the labeling of detail 2/P101. It appears to be mis-labeled (e.g. cold water labeled as 1-1/4” TRAP ARM, a 2” V UG, a vent labeled as a 1-1/2” TRAP ARM, etc.). Reference: Section 107.2.1, IBC 2018. 2. Coordinate the fixture marks for P-1 and P-2 in the Fixture Schedule and the Plumbing Fixture Specifications. 3. Verify that the distance from the hot water source to the hot water termination for the public lavatory in room 141 complies with the requirements of Section C404.5, IECC 2018, i.e., a maximum of 24” of ½” pipe from the hot water source to the termination of the fixture supply. |
||
| 03/04/2025 | Fire New Construction Standard | REVIEW COMPLETED | Fire Alarm and Fire Sprinklers requires a separate submittal and permit. | ||
| 03/19/2025 | Historic Standard | REVIEW COMPLETED | The Dunbar Pavilion review is scheduled for PRS on 3/27/2025. If you have any questions, contact Michael.Taku@tucsonaz.gov. |
||
| 02/26/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |