Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0225-00363
Parcel: 112054090

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - LIMITED v.1

Permit Number - TC-COM-0225-00363
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/06/2025 Commercial Electrical APPROVED
03/12/2025 Commercial Mechanical APPROVED
03/12/2025 Commercial Plumbing APPROVED
03/04/2025 Site Zoning APPROVED
03/12/2025 Water - PDSD APPROVED
03/06/2025 Outdoor Lighting NOT REQUIRED No changes to outdoor lighting.
03/20/2025 Site Engineering NOT REQUIRED
03/20/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/13/2025 Commercial Building REQUIRES RESUBMIT Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed.
1. Please amend the plans to provide a fully accessible toilet room, as required by IBC Section 1107 and in accordance with the following 2009 ICC A117.1 technical requirements, to include but not limited to:
A. Turning Space-Section 304, Knee and Toe Clearance-Section 306, Water Closets and Toilet Compartments-Section 604, Clearance 604.3, Grab Bars 604.5, Lavatories and Sinks-Section 606
2. Please amend the plans to provide an accessible break room sink and counter. Sinks shall comply with Section 606 and the requirements of Section 804.
Please contact me if you have any questions about these comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
02/27/2025 Fire New Construction REVIEW COMPLETED
02/26/2025 PDSD Application Completeness Express REVIEW COMPLETED