Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.2
Permit Number - TC-COM-0225-00357
Review Name: COMMERCIAL REVIEW - LIMITED v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/24/2025 | Commercial Plumbing | APPROVED | |||
| 03/20/2025 | Site Zoning | APPROVED | |||
| 03/28/2025 | Site Engineering | NOT REQUIRED | |||
| 03/28/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/24/2025 | Commercial Building | REQUIRES RESUBMIT | For questions in regards to plan review comments, please contact Bill McClellan by email at bmcclellan@willdan.com or cell (928)580-3179. 1. Sheet A-1 List all adopted building codes on plans for design to include mechanical, plumbing, energy and electrical. Incomplete. 2018 IBC 107.2.1 (BM) 2. Sheet A-1 At code analysis section, identify occupant load and exiting requirements. Incomplete. 2018 IBC 1004 & 1006 (BM) |
||
| 03/24/2025 | Commercial Electrical | REQUIRES RESUBMIT | 1. Sheet E-1 Will need to provide or identify maintenance receptacle for both AH & CU location to comply with 2017 NEC 210.63 (BM) 2. Sheet E-1 Provide interior lighting compliance certificate per 2018 IECC C405.3.2 (BM) |
||
| 03/24/2025 | Commercial Mechanical | REQUIRES RESUBMIT | 1. Sheet MP-1 Mechanical system plan design will need to identify CFM at 8X14 SA in leasing office, equipment schedule and data for split system, condensation drain termination to an approved location, ducting to comply with IECC requirements, OSA for system, exhaust fan ducting and termination. Incomplete per 2018 IMC 106.3.1 (BM) 2. Sheet MP-1 Mechanical key note #2 identifies new CU on existing roof. Clarify existing roof structure will support new load added. Not addressed. 2018 IBC 107.2.1 (BM) 3. Sheet MP-1 Identify roof or parapet height of walls at new CU location to verify any required access and guards for equipment maintenance. 2018 IMC 306.5 &304.11 (BM) 4. Sheet MP-1` Will need to provide mechanical compliance certificate for system. Incomplete 2018 IECC C502.2.3 & C403.3 (BM) |
||
| 03/07/2025 | Fire New Construction | REVIEW COMPLETED | |||
| 03/07/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |