Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0225-00356
Parcel: 12105030A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0225-00356
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/10/2025 Commercial Electrical Standard APPROVED
03/17/2025 Commercial Mechanical Standard APPROVED
03/14/2025 Site Zoning Standard APPROVED
03/27/2025 Site Engineering Standard NOT REQUIRED
03/27/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/17/2025 Commercial Building Standard REQUIRES RESUBMIT Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed.
1. Please amend the plans to provide a detailed description of the work involved in this permit’s scope. IBC 105.3
2. Sheet a1.0 & a7.0: Rest Room #106 has a reference to Keynote 22.4 Emergency Shower. Is there an emergency shower planned for room 106? If so, please provide complete drawings and details depicting the emergency shower construction, including architectural, and plumbing drawings. IBC 107.2.1 For example,
Wall construction and coverings IBC 1209.2.3 & Applicable portions of Section 2509, including 2509.1 Wet areas. Table 2509.2 Backerboard Materials, 2509.3 Limitations.
3. Sheet S1.0: Drawing1/S1.0 indicates #3 stitch bars. Are these bars to be grouted or epoxied in place? Please provide a drawing or note to indicate where, and how these bars are to be installed. IBC 107.2.1
4. Please provide the structural calculations used in the design of this project. IBC 107.2.7
5. If special inspections are required, please amend the plans to provide a statement of special inspections with a project specific schedule if special inspections. Additionally please list the required special inspections on the plans.
Additionally, provide the City of Tucson Special Inspection Certificate(s) with Parts A and B
completed with the next submittal. IBC 107.1 SI form link:
https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate.pdf
Please contact me if you have any questions about these comments.
Mark Masek
Plans Examiner – Building Safety
Planning and Development Services | City of Tucson
main 520.837.4994
email mark.masek@tucsonaz.gov
03/17/2025 Commercial Plumbing Standard REQUIRES RESUBMIT Provide a plumbing design for the installation of the emergency shower.
02/27/2025 Fire New Construction Standard REVIEW COMPLETED
02/24/2025 PDSD Application Completeness Express REVIEW COMPLETED