Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0225-00347
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/10/2025 | Commercial Electrical Standard | APPROVED | |||
| 03/17/2025 | Commercial Plumbing Standard | APPROVED | |||
| 03/24/2025 | Site Engineering Standard | APPROVED | |||
| 03/14/2025 | Site Zoning Standard | APPROVED | |||
| 03/24/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/17/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. Sheet A500: Wall section A1 indicates a plywood deck above the ceiling; however, no additional information is included about this area above the ceiling. Is it an existing condition, or it a new feature of this construction. If new, please provide construction details and use of the area. If used for storage, please provide design and calculations prepared by an Arizona licensed design professional. IBC 107.2.1 2. Sheet PM101: A9/PM101 new mechanical equipment suspended form structure above. Please provide construction details showing how this is to be done, provide the weight of the unit and an engineering evaluation to ensure the existing structure is of sufficient strength to withstand the new load. IBC 107.2.1 Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 |
||
| 03/17/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | 1. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Sections C403.1.1 and C502.2.3, IECC 2018. 2. Show that the specified heat pump for the addition complies with the requirements of Section C403, IECC 2018. Reference: Section C502.2.3, IECC 2018. 3. Show how a secondary condensate drain is being provided and that it will discharge to a conspicuous point of disposal without damaging any building component. Reference: Section 307.2.3 IMC 2018 4. The ventilation schedule calls for 50 CFM of outside air to be supplied to the office space but the split system schedule and the mechanical floor plan do not indicate that any outdoor air is being provided to the indoor unit. |
||
| 02/25/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 02/24/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |