Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0225-00335
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/17/2025 | Commercial Building Standard | APPROVED | |||
| 03/07/2025 | Commercial Electrical Standard | APPROVED | |||
| 03/13/2025 | Site Zoning Standard | APPROVED | |||
| 03/13/2025 | Water - PDSD Standard | APPROVED | |||
| 03/07/2025 | Outdoor Lighting Standard | NOT REQUIRED | No changes to the outdoor lighting. | ||
| 03/27/2025 | Site Engineering Standard | NOT REQUIRED | |||
| 03/27/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/14/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | The Mechanical Floor Plan, M-1, appears to show a total of 200 CFM of supply air to room 101 (women’s restroom) but EF-2 is only scheduled to move 175 CFM. Revise the balancing information so that all of the air supplied to the restrooms will be exhausted. Reference: Section 403.2.1 (4), IMC 2018. | ||
| 03/14/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | The hot water piping shown in Partial Water Isometric , A/P-2, is very different from detail 204 on P-3. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018. | ||
| 02/25/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 02/21/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |