Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0225-00300
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 03/05/2025 | Commercial Electrical Standard | APPROVED | |||
| 03/05/2025 | Outdoor Lighting Standard | APPROVED | |||
| 03/14/2025 | Site Engineering Standard | APPROVED | |||
| 03/13/2025 | Site Zoning Standard | APPROVED | |||
| 03/14/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/10/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. Please provide structural design, calculations and construction drawings prepared by an Arizona licensed registrant, for the steel parking shades and light pole bases with next submittals IBC 107.2.7 2. If Special inspections are required, please provide a statement of special inspections for this project, as well as a list of the required special inspections. IBC 107.2.1, IBC 1704, IBC 1705 3. Additionally, provide the City of Tucson Special Inspection Certificate(s) with Parts A and B completed with the next submittal. IBC 107.1 SI form link: https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate.pdf Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 02/25/2025 | Fire New Construction Standard | REVIEW COMPLETED | Project requires a Knox Box gate override switch as indicated on plans page A-401 | ||
| 02/13/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |