Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0225-00277
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/15/2025 | Commercial Electrical Standard | APPROVED | Electrical(E) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 2/14/2025 1:15:19 PM |
||
| 02/15/2025 | Commercial Mechanical Standard | APPROVED | Mechanical(M) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 2/14/2025 2:40:55 PM |
||
| 02/15/2025 | Commercial Plumbing Standard | APPROVED | Plumbing(P) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 2/14/2025 2:41:05 PM |
||
| 03/03/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/03/2025 | Site Engineering Standard | PENDING ASSIGNMENT | |||
| 03/03/2025 | Site Zoning Standard | PENDING ASSIGNMENT | |||
| 03/03/2025 | Water - PDSD Standard | PENDING ASSIGNMENT | |||
| 02/15/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Structural(S) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 2/14/2025 11:47:49 AM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Denied Reason: Date Completed : 2/14/2025 11:27:03 AM 1. Sheet A-102/Occupant Load Calculation: The occupant load calculation provided is incorrect. It doesn't include the waiting area. This area would be considered an assembly area and should be calculated accordingly. There is a distinct difference between occupancy classification and occupancy use. The exceptions provided in Section 303.1.2 apply to that of classification and the requirements of max. allowable area, height, stories, mix-use requirements and overall classification of the building. So yes, this room is considered as business in the overall context of the structure and can comply with the business requirements previously mentioned. However, when calculating occupant loads, one must calculate based on the use of the space. The waiting room's use is assembly, and the occupant load must be calculated as such in accordance with Section 1004 and Table 1004.5. Provide a corrected occupant load in accordance with 2018 IBC Table 1004.5. 2. General/Existing floor plans: No existing floor plan has been provided. Provide a detailed existing floor plan. 3. General/Demolition floor plans: No demolition floor plan has been provided. Provide a detailed demolition floor plan. |
||
| 02/19/2025 | Fire New Construction Standard | REVIEW COMPLETED | Fire Alarm modification will required a separate permit, adopted city codes are the 2024 IFC with local amendments. | ||
| 02/11/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |