Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0225-00236
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/28/2025 | Commercial Building Standard | APPROVED | |||
| 02/21/2025 | Commercial Electrical Standard | APPROVED | |||
| 03/03/2025 | Commercial Mechanical Standard | APPROVED | |||
| 03/04/2025 | Site Zoning Standard | APPROVED | |||
| 03/04/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/03/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | 1. Clarify General Note #2 on sheet P1. The need for a backwater valve is not determined by the depth of the sewer piping. Provide the rim elevation of the next upstream sanitary manhole and the first-floor elevation. Determine the need for a backwater valve per Section 714.1, IPC 2018, as amended by the City of Tucson. 2. Provide the minimum size for the natural gas branch for the hot plate (#20). Reference: Sections 402.1 and 402.3, IFGC 2018. 3. Verify the size of the existing water meter. Tucson Water records show a 1” water meter, serial number 19221047. |
||
| 02/10/2025 | Fire New Construction Standard | REVIEW COMPLETED | Fire extinguishers shall be installed accordingly with the 2024 IFC Section 906 | ||
| 02/08/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |