Permit Review Detail
Review Status: Requires Resubmit
Review Details: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Permit Number - TC-COM-0224-00334
Review Name: BUILDING DEFERRED SUBMITTAL REVIEW v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 09/11/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 09/11/2025 | Post-Installed Anchor Inspection (Deferred Submittal) Express | REQUIRES RESUBMIT | Page 24 of submitted field report packet states that (7) light pole sites failed the anchor bolt inspection and an RFI was requested regarding the resolution. No RFI response was submitted. Please resubmit with RFI response stating whether the correct anchor bolts were installed or a PE letter stating the ones used are acceptable. Please include the completed SIC in the resubmittal as well. | ||
| 09/11/2025 | Concrete Installation Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
| 09/11/2025 | Other Inspection Reports (Deferred Submittal) Express | REVIEW COMPLETED | OUTDOOR LIGHTING CODE CALCULATIONS | ||
| 09/11/2025 | Other Inspection Reports (Deferred Submittal) Express | REVIEW COMPLETED | REINFORCING STEEL | ||
| 09/08/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 09/11/2025 | Site Prep Inspection (Deferred Submittal) Express | REVIEW COMPLETED | |||
| 09/11/2025 | Welding Inspection (Deferred Submittal) Express | REVIEW COMPLETED | Not req'd per PE Chase Chittester |