Permit Number: TC-COM-0224-00332
Parcel: 12709011M

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0224-00332
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/18/2024 Site Engineering NOT REQUIRED
03/19/2024 Site Zoning NOT REQUIRED
03/19/2024 Water - PDSD NOT REQUIRED
03/19/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
03/14/2024 External Reviewers - Stantec REQUIRES RESUBMIT March 12, 2024
1st Review

Intertech Architectural Interiors
Attn: Wayne Swan
6089 East Grant Road


Re: RINCON RESEARCH
REMODEL (1ST FLOOR)

City of Tucson Permit Number: TC-COM-0224-00332
Stantec Project Number: 185215066
Stantec File Number: TUC-24-020

Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken.

The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval.

Occupancy
Group Construction
Type Area
(Square feet) Occupant
Load Automatic
Fire Sprinklers Fire
Alarms
B II-A 2,534 17 Yes Yes
Separate Permits: Automatic fire sprinklers and fire alarm.
Deferred Submittals: None.
Special Inspections: None.

GENERAL COMMENTS

1. The nature of this proposed tenant space appears to be a testing laboratory. Are hazardous chemicals involved in the testing process? If so, please provide which ones and the quantities. We are trying to determine is control area will be needed. {I noticed the cabinet in the workshop. Is this a fire cabinet?} [Ref. IBC 2018 Sec. Table 307.1 & Sec. 414]


ARCHITECTURAL COMMENTS

Sheet A2

1. The Reflected Ceiling Plan conflicts the Mechanical Plan on sheet M1. The RCP indicates the fan coil unit in the workshop as existing, but the mechanical plan shows it as a new unit. Please clarify.

Sheet A5

1. The detail indicated for drilling of the existing post-tensioned concrete is not stamped by an engineer for compliance. Please have the design reviewed by an engineer to verify structural compliance with proposed no drilling zones, concrete column clearance, and 8” core allowance. Please also clarify the elements of the detail. What does the tightly spaced hatches represent? The dimensions from the column indicate 30” but the description says a clearance of 36” from the column. Please clarify.

STRUCTURAL COMMENTS

There are no comments.

MECHANICAL COMMENTS

General

1. Please provide energy conservation compliance reports for the new mechanical units indicated. [Ref. IECC 2018 C403.3.2]

PLUMBING COMMENTS

There are no comments.

ELECTRICAL COMMENTS

There are no comments.


Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline.

Plans reviewed by:
Trevor Bies,
Senior Plan Reviewer
602-338-9922
trevor.bies@stantec.com
03/07/2024 Fire New Construction REVIEW COMPLETED
02/28/2024 PDSD Application Completeness REVIEW COMPLETED