Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0224-00306
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
05/23/2024 | Design Review | APPROVED | Applicant has indicated east and west facades are maintained as currently existing, except for the filming on the windows. | ||
05/31/2024 | Site Zoning | APPROVED | |||
05/31/2024 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
05/22/2024 | External Reviewers - SAFEBuilt | REVIEW COMPLETED | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 2/28/2024 4:12:14 PM No structural review required. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 5/13/2024 10:16:27 AM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 5/13/2024 8:55:03 AM 1. (RESOLVED) - General - Provide roof plan Show clear dimensions of all equipment to edges of building. Provide clear dimensions of exhaust to O/A intakes - 2018 IBC Section [A]107.2.1 Information on construction documents. - 2018 IMC Section [BE] 304.11 Guards 2. (RESOLVED) - General - Provide ComCheck Mechanical compliance Certificate - 2015 IECC Section Section C103.2Information on construction documents. Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved Reason: Date Completed : 5/10/2024 4:00:51 PM 1. For comment concerning E103 POWER PLAN DETAILS: Comment only, Keynote 9 comments concerning voltage requirements should not be needed. Panel/source voltage is 208V which is between 198-218 volts. Resolved 2. For the following comment on sheet E601 ELECTRICAL SCHEDULES: The Fault Current Notes declaration is unacceptable per Tucson city requirements. Engineer shall derive estimated fault current from the local power company’s website that lists maximum fault current availability based upon the size of transformer feeding site power. Then use this Maximum Fault rating at the location of Keynote 1 (on sheet E501). Next, calculate the short circuit value for Panel MP using the length of cable called out by Keynote 6. If Panel MP2 is next to MP1, it can use the same short circuit value to determine both panels fully rated KAIC requirements. Resolved. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 5/20/2024 11:25:37 PM Third Plumbing Review: OK Resolved-1). notate the gas sizing table used on the gas load summary on plan page P101 -2018 IFGC 402.3 Resolved-2). Fixture schedule on plan pages P002 & I602: These plan pages are missing the manufacture names & model numbers. Need to include manufacturer names and model numbers or provide product spec manual- 2018 IPC 303 Resolved-3). add watermain piping sizes periodically to riser on plan page to plan page P502 -2018 IPC 106.3.1, 604.1 Resolved-4). Add Piping materials for water sanitary , gas to plan page P001 or provide spec manual -2018 IPC 605.4, 702, IFGC 403 Resolved-5). Add combustion air illustration & method for the furnaces & water heater to the mechanical pages. -2018 IFGC 304, 503.1 Resolved-6). Add the water heater exhaust illustrations & Method to mechanical pages -2018 -IFGC 503.1 |
||
05/28/2024 | Historic | REVIEW COMPLETED | |||
05/20/2024 | PDSD Application Completeness | REVIEW COMPLETED |