Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0224-00287
Parcel: 105097390

Address:
75 W RIVER RD

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0224-00287
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/05/2024 Fire New Construction NOT REQUIRED
03/13/2024 Bldg Permits - Post Review PENDING ASSIGNMENT
03/12/2024 Site Engineering REQUIRES RESUBMIT Tucson codes and ordinances can be found online at https://codelibrary.amlegal.com/codes/tucson/latest/overview

1. Per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A development package (DP) meeting the requirements of Administrative Manual (AM) 2-06 must be submitted and approved prior to approval of this building plan. The DP is a separate submittal from the building plans and is submitted in the TDC Online Portal.

Lianne Evans
lianne.evans@tucsonaz.gov
03/13/2024 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review
Nathan Herrera, Planner

PROJECT:
TC-COM-0224-00287
75 W River Road. Tucson, AZ. 85704
EV Charging Stations

TRANSMITTAL: March 13, 2024

Please resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.


1. COMMENT: Alterations and additions to a commercial site including the addition of the EV Charging Stations require a Development Package (MINOR DEVELOPMENT CHANGES TO EXISTING COMMERCIAL/INDUSTRIAL SITES).

A Development package is a separate submittal and must be submitted and approved prior to the approval of the commercial plans. Information on development packages can be found here: https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Development-Package

Checklist for minor development changes to exiting commercial site: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf


If you have any questions about this transmittal, please contact Nathan.Herrera@tucsonaz.gov.
02/15/2024 External Reviewers - SAFEBuilt REVIEW COMPLETED Structural(S) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved
Reason:
Date Completed : 2/15/2024 6:21:51 AM


Mechanical N/A


Building(B) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved
Reason:
Date Completed : 2/15/2024 6:21:33 AM


Electrical(E) Reviewer
Kimiyoshi Shimabukuro
kshimabukuro@safebuilt.com
Approved
Reason:
Date Completed : 2/15/2024 6:21:41 AM



Plumbing N/A
02/13/2024 PDSD Application Completeness REVIEW COMPLETED