Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.2
Permit Number - TC-COM-0223-00667
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 07/31/2023 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 07/24/2023 | Site Engineering | REQUIRES RESUBMIT | See zoning comment | ||
| 07/24/2023 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0223-00667 1000 W Congress St. – C-1 (2nd Review) TRANSMITTAL: July 24, 2023 This site is located in C-1 zone (UDC 4.7.20). Food Service is a permitted use in the zone, (Table 4.8-4), subject to Use Specific Standards 4.9.4.M.1 & 5 and 4.9.13.O. 1. Zoning has reviewed the plan for compliance with development package (DP) TD-DEV-1222-00074 but until the DP has been approved by all review agencies Zoning cannot approve this plan. 2. The architectural site plan does not match the DP. The following items are shown on the architectural site plan but not on the DP: Entry canopy. Fire Places – street perimeter yard setbacks may be an issue. Tree circles Either the building plans or the DP will need to be changed so the plans match. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 07/31/2023 | External Reviewers - SAFEBuilt | REVIEW COMPLETED | Structural(S) Reviewer Daljit Benipal dbenipal@safebuilt.com Approved with Comments Reason: Date Completed : 3/20/2023 2:28:43 PM NOTE: Every effort has been made to identify the code violations. Any oversight by the review team shall not be considered an authority to violate, set aside, cancel or alter applicable codes or ordinances. The plan review and permit issuance shall not be considered a warranty or guarantee. The Structural Engineer is responsible for following ALL applicable Federal, State and local Municipal Codes and Ordinances. Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 7/19/2023 11:38:09 AM Mechanical(M) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 7/19/2023 11:38:15 AM Electrical(E) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 3/16/2023 10:23:28 AM Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Conditionally Approved Reason: Date Completed : 7/30/2023 11:09:01 AM Second Plumbing Review: BLDG #2 1). OK 2). Resolved- Show the accessible route with distances to the plumbing restrooms that will serve this building. -IPC **Restrooms' located in BLDG 1** Also See attached approved Genderless restroom appeal 3).OK 4). OK BLDG #2 Hose Bibs on plan page P1.0 need shut off valves-IPC 606.2 **Subject to Field Inspections 5).Resolved - Bldg. #2 needs a service sink -IPC 403.1*service sink located in BLDG 1** |
||
| 07/18/2023 | PDSD Application Completeness Express | REVIEW COMPLETED |