Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0126-00093
Parcel: 11619360D

Review Status: In Review

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0126-00093
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
02/02/2026 Commercial Building Standard APPROVED
01/27/2026 Commercial Electrical Standard APPROVED
02/02/2026 Commercial Mechanical Standard APPROVED
02/02/2026 Site Zoning Standard APPROVED Interior TI
02/02/2026 Water - PDSD Standard APPROVED
02/02/2026 Commercial Plumbing Standard NOT REQUIRED
01/27/2026 Outdoor Lighting Standard NOT REQUIRED
N/A Bldg Permits - Post Review Express PENDING ASSIGNMENT
N/A Landfill Standard PENDING ASSIGNMENT
02/02/2026 Site Engineering Standard REQUIRES RESUBMIT Site Engineering Review

TC-COM-0126-00093
310 N COMMERCE PARK LP

Summary: Reorganization of interior spaces to create new offices

Site Engineering comments are as follows:

1. Because the building containing the offices to be redone lies within the FEMA AE Zone of the Santa Cruz River Floodplain, a Floodplain Use Permit is required for the scope of work. Go to TDC-Online and navigate to the Sub-records tab of this permit to apply. The floodplain use permit must be issued prior to the approval of this permit. This permit (TC-COM-0126-00093) must also 00be re-submitted. Please, include with the floodplain use permit application a cost estimate with a breakdown of materials, labor, and fees, as well as a site plan.

2. The Location Map shall have the project roughly centered within a square mile section with a scale of 3-in equals 1-mi.

To re-submit, visit the Tucson Development Center Online at:
https://tdc-online.tucsonaz.gov/#/home

The instructions for resubmittal can be found at: Revisions and Resubmittals

Engineering Associate: Ryan Insalaco
ryan.insalaco@tucsonaz.gov
02/03/2026 Fire New Construction Standard REVIEW COMPLETED
01/27/2026 PDSD Application Completeness Express REVIEW COMPLETED