Permit Review Detail
Review Status: In Review
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0126-00018
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: In Review
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 01/20/2026 | Commercial Electrical Standard | APPROVED | |||
| 01/29/2026 | Commercial Mechanical Standard | APPROVED | |||
| 01/29/2026 | Commercial Plumbing Standard | APPROVED | |||
| 01/15/2026 | Outdoor Lighting Standard | APPROVED | |||
| 01/29/2026 | Site Zoning Standard | APPROVED | |||
| 01/29/2026 | Water - PDSD Standard | APPROVED | |||
| 01/09/2026 | Site Engineering Standard | NOT REQUIRED | |||
| N/A | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| N/A | Historic | PENDING ASSIGNMENT | |||
| 02/01/2026 | Commercial Building Standard | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0126-00018 ADDRESS: (1316 E BROADWAY BL Unit:BLDG 1 TUCSON, AZ 85719) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Should you have any questions about these Commercial Building comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976. COMMENTS: 1. DRAWINGS INDICATES THE FOLLOWING. a. New continuous foundation. b. New walls within existing walls. c. New roof I-joist d. New 3 ply roofing e. Replace windows f. Infilling existing door g. New front entry door h. New concrete slab and compacted ABC i. New interior wall? 1. Please confirm is all interior walls are new. 2. Are there any existing interior walls? 2. PERMIT DESCRIPTION IS: “Interior TI of current office, as a result of fire damage. No change in use.” a. This is more than Interior TI b. HISTORIC a. This structure was built in 1937. b. This project will have to go through our Historic review. 1. I have added Historic as part of the review. 3. CODE ANALYSIS IS PROVIDED a. Is this going to be a new tenant? b. Code analysis points to wanting a new certificate of occupancy. a. Please respond with an affirmative should a new c of o is requested. 4. DETAIL 7 SHEET D1 a. Provide a detail drawing that includes illustration of: a. Cant strip b. Counter flashing between existing parapet and new roof effectively making it water tight. 5. HVAC a. Provide cub detail at HVAC. b. Illustrate the additional structural support being added as a result of the HVAC installation. a. Framing Keynote #4 on Sheet S2 6. SCUPPER a. Provide detail drawing illustrating the scuppers and overflow integrating to the new roof. 7. HOLD-DOWN a. General Framing Note #1 Sheet S2 a. Please identify and label the shear wall location. b. No hold-down identified on the drawings. 1. Please locate and label the hold-downs. 8. FOUNDATION KEYNOTES #2 a. New 4” inch slab over vapor barrier over existing slab. a. Detail #1 Foundation Detail Sheet D1 1. Detail shows new 4” concrete slab. a. However, it shows compacted ABC and now existing slab. 2. Detail #1 does not indicate the depth of the new footing. a. Please show this dimension. b. It shall be minimum 12 inches from surface of native soil to the bottom of the new footing. 3. Keynote #3 calls for a joint filler. a. Please show this in your detail #1 Foundation detail sheet D1. b. Actually, Foundation Keynote #5 calls for 1’-6”a minimum. Please illustrate and include this within detail #1 Foundation detail sheet D1. c. Provide an enlarged detail drawing illustrating how this filler works. 9. SPECIAL INSPECTIONS a. Epoxy is proposed at dowels between new foundation and existing foundation. a. Special inspections shall be required. b. In your Cover Sheet/Front Page, please list the special inspections required for this project IBC 107.2.1 For example, Post installed anchors. c. Please provide a special inspection certificate with Part A, and Part B completed with next submittal. This form is available in https://www.tucsonaz.gov/files/sharedassets/public/city-services/planning-development-services/documents/special_inspection_certificate.pdf Ensure that Part B is sealed/signed/dated by the special inspector in charge. Ensure to use Special Inspectors who are active in the approved list of special inspectors. They are available in the following links: special-inspectors-by-name.pdf (orovalleyaz.gov) https://content.civicplus.com/api/assets/e426f390-7bd6-4c47-9bc1-357282083afd https://www.phoenix.gov/pddsite/Documents/TRT/dsd_trt_pdf_00870.pdf 10. POINT OF USE WATER COOLER a. Per City of Tucson Amendment, the following shall apply. a. The water dispenser must be connected to a permanent supply of potable water. b. A permanently mounted disposable cup dispenser shall be installed with the dispensing end between 34” and 48” above finish floor meeting ICC A117.1. c. Show the plumbing lines within the Plumbing drawings. d. Locate and label on the floor plan. 11. NEW CONCRETE SLAB a. Since new concrete slab is proposed, are all interior walls being built new? b. Please confirm, no existing walls are being kept. 12. Please resubmit. |
||
| 01/28/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 01/07/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |