Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Number: TC-COM-0125-00202
Parcel: 132131390

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.3

Permit Number - TC-COM-0125-00202
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/24/2025 Commercial Structural Standard APPROVED Structural(S) Reviewer
Madeline Nelson
mnelson@safebuilt.com
Approved
Reason:
Date Completed : 2/22/2025 11:22:14 PM


Building(B) Reviewer
Andrew Bevis
abevis@safebuilt.com
Approved
Reason:
Date Completed : 2/11/2025 9:57:02 AM
03/07/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
02/24/2025 Commercial Electrical Standard REQUIRES RESUBMIT Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 2/17/2025 4:58:00 PM
1. Need to provide a Tucson city exterior lighting calculation (This is different from an exterior lighting comcheck)
Reference pdf below: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residentialpermits/outdoor_lighting_calculation.pdf
2. E002 ELECTRICAL RISER DIAGRAM AND DETAILS: Need to provide fault current calculations for each major panel and for a typical G panel (perhaps a calculation for a G panel on each floor).
3. E006 ELECTRICAL ENLARGED PLANS: Need to provide an interior lighting comcheck for detail 1 and 4 (lobby and Laundry/Fitness areas)
4. T002 LOW VOLTAGE - FIRST AND SECOND FLOOR: comment only, may want to review WAP specifications as WAP count seems high.
02/24/2025 Commercial Mechanical Standard REQUIRES RESUBMIT Mechanical(M) Reviewer
Jorge Valido
jvalido@safebuilt.com
Denied
Reason:
Date Completed : 2/17/2025 12:36:51 PM
1. General - Provide COMcheck Mechanical Compliance Certificate. Any other APPROVED agency is acceptable. -
2018 IECC Section C403.3.2 HVAC equipment performance requirements.
2. General - Provide Heat Load Calculations. - 2018 IECC Section C403.1.1 Calculation of heating and cooling loads.
3. Plan Sheet M002 - Detail #3 states on detail for Guest Laundry, PROVIDE MOTERIZED DAMPER INTREGAL WITH
EXTERIOR LOUVER. (TYP.). Provide size for O/A Makeup Louver. Substantiate with calculations. - 2018 IMC
Section 504.6 Makeup air.
02/24/2025 Commercial Plumbing Standard REQUIRES RESUBMIT Perry Hendershott
phendershott@safebuilt.com
Denied
Reason:
Date Completed : 2/22/2025 3:35:17 PM
First Plumbing Review:
1). Plan page P002 Detail1: Missing bldg drain sizing indicators continually on main trunk line. Add bldg drain sizing
indicators continually on main trunk line.. -2018 IPC 710
2). Plan page P002 Detail1: 6" building drain undersized for 950 drainage fixture units as shown on plan page P001. Update
Bldg drain sizes & slopes to conform with -2018 IPC 710
3). General Plumbing plans: Multiple washers will be required to discharge through an lint interceptor. Update plans to show
washing machines discharging through lint interceptor(s) & add Lint interceptor to fixture schedule. -2018 IPC 1003.6
4). Plan Page P006 detail 1: Missing gas sizing table used. Add gas sizing table used that derives from -2018 IFGC 402.4
5). Plan Page M002 detail 3: Guest Dryers missing combustion air intake louvers. Add combustion air intake Louvers for
guest laundry the same as shown in staff laundry on detail 2. -2018 IFGC 304
02/24/2025 Outdoor Lighting Standard REQUIRES RESUBMIT Ron Ross
rross@safebuilt.com
Denied
Reason:
Date Completed : 2/17/2025 4:58:00 PM
1. Need to provide a Tucson city exterior lighting calculation (This is different from an exterior lighting comcheck)
Reference pdf below: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residentialpermits/outdoor_lighting_calculation.pdf
2. E002 ELECTRICAL RISER DIAGRAM AND DETAILS: Need to provide fault current calculations for each major panel and for a typical G panel (perhaps a calculation for a G panel on each floor).
3. E006 ELECTRICAL ENLARGED PLANS: Need to provide an interior lighting comcheck for detail 1 and 4 (lobby and Laundry/Fitness areas)
4. T002 LOW VOLTAGE - FIRST AND SECOND FLOOR: comment only, may want to review WAP specifications as WAP count seems high.
03/07/2025 Site Engineering Standard REQUIRES RESUBMIT TC-COM-0125-00202
1680 E TUCSON MARKETPLACE BL

The building permit cannot be approved until the associated development package, TD-DEV-0125-00003, is approved. Per UDC Article 3.3.3.7.a The approved site plan (Development Package) on file with the PDSD is the basis for issuance of building permits.

Chris Arrington
chris.arrington@tucsonaz.gov
03/03/2025 Site Zoning Standard REQUIRES RESUBMIT FROM: Ramiro Olivarez
PDSD Zoning Review Section

PROJECT: TC-COM-0125-00202 – Travelers Accommodation, Lodging (ref. TD-DEV-0125-00003) (1st Review)
1680 E TUCSON MARKETPLACE BL – PAD-15
TRANSMITTAL DATE: March 03, 2025

This site is located in PAD-15, Travelers Accommodation, Lodging is an allowed use in the PAD.

COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed.
1. Comment: Zoning has reviewed the Hotel plans for compliance with Development Package (DP) TD-DEV-0125-00003 and all though the plans appear to match until the DP is approved by all review agencies Zoning cannot approve this permit.

RESUBMITTAL OF THE FOLLOWING IS REQUIRED: Approval of TD-DEV-0125-00003 and resubmittal of revised plans.
If you have any questions about this transmittal, please contact Ramiro Olivarez at Ramiro.Olivarez@tucsonaz.gov
02/28/2025 Water - PDSD Standard REQUIRES RESUBMIT 1. Provide the site plan noted on the Enlarged Mechanical Room Plan, 7/P007, showing the installation of the 3” water service to the hotel. An approved development plan is not to be used for construction or modification of on-site utilities (e.g. water service to buildings, building sewers, site lighting, electrical service to buildings, etc.). The construction of the on-site utilities may be included with the permit for constructing the building or as a separate permit.
2. Provide the size of the water meter serving this building, the size of the backflow preventer associated with the water meter, and the total water demand served by the water meter. Reference: Section 107.2.1, IBC 2018.
03/06/2025 Fire New Construction Standard REVIEW COMPLETED The following items apply to the proposed project:
1. Fire alarm and sprinklers system requires a separate permit, NFPA72 2022 edition for fire alarms and NFPA13 2022 edition.
2. Fire extinguishers shall comply with section 906 of the 2018 IFC.
3. The project requires a test for the Emergency Responders Communications per the 2018 IFC section 510.
4. Project shall comply with the 2018IFC Appendix B and C.
5. Project shall comply with the 2018 IFC, Appendix D, Aerial Apparatus Access Roads
6. Project shall comply with section 506 "key Boxes" of the 2018 IFC.