Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL REVISION v.1
Permit Number - TC-COM-0125-00181
Review Name: COMMERCIAL REVIEW - FULL REVISION v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/08/2026 | Commercial Plumbing Standard | APPROVED | Sump pump | ||
| 03/26/2026 | Site Engineering Standard | NOT REQUIRED | |||
| 04/08/2026 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 03/25/2026 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Additionally, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. Please contact me if you have any questions about the below comments. I can be reached at email mark.masek@tucsonaz.gov 1. Please provide new non-stamped construction drawings for this revision with the stamps of the architect and the structural engineer on the plans. IBC 107.2.1 Please contact me if you have any questions about the above comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 04/08/2026 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0125-00181 (6924 E SPEEDWAY BL TUCSON, AZ 85710) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2024 International Building Code (IBC), 2023 National Electrical Code (NEC). Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov Electrical Review: Plans shall include (as necessary for scope of work), but may not be limited to items below: 1. The addition of the new sump-pump requires complete electrical plans for this work. 2. Provide an electrical plan that shows the location of the panel, circuits, underground or overhead routes, receptacles, or other modified or new electrical work. 3. Show all wiring methods in detail for all new or modified branch circuit conductors and feeders. Conductor type and conduit size/type. Note wet use requirements. NEC arts;300 and 408.4. 4. Show a GFCI per NEC 210.8(B). 5. Provide a panel schedule, showing the circuits that are being modified, added or removed or existing. NEC arts;300 and 408.4. Include panel bus rating and A.I.C. rating. IBC 107.1. 6. Designate the circuit number on the electrical plans, that corresponds to the panel schedule, at the location of each existing, new or modified light fixture, receptacle, and equipment disconnect switch, NEC arts;300 and 408.4. IBC 107.1. Each electrical outlet should be labeled by panel and circuit number. |
||
| 03/26/2026 | Site Zoning Standard | REQUIRES RESUBMIT | PDSD TRANSMITTAL FROM: Bobby Parsons Zoning Section Review PROJECT: TC-COM-0125-00181 6924 E. Speedway Blvd. Tucson, AZ 85710 Community Pool Area Renovations (1st Review) TRANSMITTAL DATE: 3/26/2026 This site is located in the R-2 zone (UDC 4.7.9). Multifamily is an allowed use in the zone (UDC Table 4.8-2) subject to Use Specific Standards 4.9.7.B.6, .9, & .10. Comments: Please resubmit revised drawings along with a detailed response letter which states how all Zoning Review Section comments were addressed. 1. Comment: Please provide a site plan that does not have previously approved city stamps on it. 2. Comment: Additional comments may be forthcoming depending on responses to zoning review comments and plans submitted. If you have any questions about this transmittal, please contact Bobby Parsons at Robert.Parsons@tucsonaz.gov. |
||
| 03/27/2026 | Fire New Construction Standard | REVIEW COMPLETED | |||
| 03/06/2026 | PDSD Application Completeness Express | REVIEW COMPLETED |