Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0125-00181
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/14/2025 | Site Zoning | APPROVED | |||
| 02/14/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/14/2025 | Commercial Building | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. Sheet A3.0: Please provide dimensioned drawings and details for the ramp handrails to include attachment details and required handrail extensions as well as being able to resist a linear load of 50 pounds per linear foot and a concentrated load of 200 pounds. IBC 107.2.1 & IBC 1012.8 & IBC 1607.8 2. Sheet A3.0: Please amend the plans (Section A and B) to call out the minimum depth of the column footings below the undisturbed ground surface as 12 inches. IBC 1809.4 3. Sheet A3.0: Please amend the plans to call out type of epoxy and ½ inch bolts to be used for Detail 1/A3.0 4. Structural Calcs: Amend the calculations to include a design criteria to include structural design information as indicated in IBC 1603.1 Please note wind speed has been amended by the City of Tucson. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
| 02/05/2025 | Fire New Construction | REVIEW COMPLETED | |||
| 02/01/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 02/14/2025 | Site Engineering | REVIEW COMPLETED |