Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0125-00150
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
02/19/2025 | Site Zoning Standard | APPROVED | |||
02/19/2025 | Water - PDSD Standard | APPROVED | |||
02/26/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
02/26/2025 | Commercial Building Standard | REQUIRES RESUBMIT | February 4, 2025 1st Review Seaver Franks Architects Attn: Rick Huch/ JaMia Dees 2552 N. Alvernon Way Tucson, Arizona 85712 Re: TUCSON FEDERAL CREDIT UNION TENANT IMPROVEMENT City of Tucson Permit Number: TC-COM-0125-00150 Stantec Project Number: 185215066 Stantec File Number: TUC-24-021 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms B V-B 3,966 45 No Yes Separate Permits: Fire alarm. Deferred Submittals: None. Special Inspections: Epoxy and expansion anchors, EFIS. ARCHITECTURAL COMMENTS General 1. Sheet ED1.0 indicates that the existing fire alarm is to be relocated. Does this building have a fire alarm installed? If so, please indicate that the modification of the fire alarm system will be provided as a separate submittal on the cover page. If not, please have this note removed. 2. Note on the cover of the drawings that special inspection is required for epoxy and expansion anchors. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. 3. Please indicate the ESR or Intertek testing number for the proposed E.I.F.S system. [Ref. IBC 2018 Sec. 1703.4.2] STRUCTURAL COMMENTS General 1. Please provide the structural calculations for the engineered structural design. [REF. IBC 2018 Sec. 107.1] MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS Sheet E2.0 1. Please indicate an exit sign above the work area/circulation door. [Ref. IBC 2018 Sec. 1013.1] Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
02/26/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | February 4, 2025 1st Review Seaver Franks Architects Attn: Rick Huch/ JaMia Dees 2552 N. Alvernon Way Tucson, Arizona 85712 Re: TUCSON FEDERAL CREDIT UNION TENANT IMPROVEMENT City of Tucson Permit Number: TC-COM-0125-00150 Stantec Project Number: 185215066 Stantec File Number: TUC-24-021 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms B V-B 3,966 45 No Yes Separate Permits: Fire alarm. Deferred Submittals: None. Special Inspections: Epoxy and expansion anchors, EFIS. ARCHITECTURAL COMMENTS General 1. Sheet ED1.0 indicates that the existing fire alarm is to be relocated. Does this building have a fire alarm installed? If so, please indicate that the modification of the fire alarm system will be provided as a separate submittal on the cover page. If not, please have this note removed. 2. Note on the cover of the drawings that special inspection is required for epoxy and expansion anchors. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. 3. Please indicate the ESR or Intertek testing number for the proposed E.I.F.S system. [Ref. IBC 2018 Sec. 1703.4.2] STRUCTURAL COMMENTS General 1. Please provide the structural calculations for the engineered structural design. [REF. IBC 2018 Sec. 107.1] MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS Sheet E2.0 1. Please indicate an exit sign above the work area/circulation door. [Ref. IBC 2018 Sec. 1013.1] Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
02/26/2025 | Commercial Mechanical Standard | REQUIRES RESUBMIT | February 4, 2025 1st Review Seaver Franks Architects Attn: Rick Huch/ JaMia Dees 2552 N. Alvernon Way Tucson, Arizona 85712 Re: TUCSON FEDERAL CREDIT UNION TENANT IMPROVEMENT City of Tucson Permit Number: TC-COM-0125-00150 Stantec Project Number: 185215066 Stantec File Number: TUC-24-021 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms B V-B 3,966 45 No Yes Separate Permits: Fire alarm. Deferred Submittals: None. Special Inspections: Epoxy and expansion anchors, EFIS. ARCHITECTURAL COMMENTS General 1. Sheet ED1.0 indicates that the existing fire alarm is to be relocated. Does this building have a fire alarm installed? If so, please indicate that the modification of the fire alarm system will be provided as a separate submittal on the cover page. If not, please have this note removed. 2. Note on the cover of the drawings that special inspection is required for epoxy and expansion anchors. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. 3. Please indicate the ESR or Intertek testing number for the proposed E.I.F.S system. [Ref. IBC 2018 Sec. 1703.4.2] STRUCTURAL COMMENTS General 1. Please provide the structural calculations for the engineered structural design. [REF. IBC 2018 Sec. 107.1] MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS Sheet E2.0 1. Please indicate an exit sign above the work area/circulation door. [Ref. IBC 2018 Sec. 1013.1] Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
02/26/2025 | Commercial Plumbing Standard | REQUIRES RESUBMIT | February 4, 2025 1st Review Seaver Franks Architects Attn: Rick Huch/ JaMia Dees 2552 N. Alvernon Way Tucson, Arizona 85712 Re: TUCSON FEDERAL CREDIT UNION TENANT IMPROVEMENT City of Tucson Permit Number: TC-COM-0125-00150 Stantec Project Number: 185215066 Stantec File Number: TUC-24-021 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms B V-B 3,966 45 No Yes Separate Permits: Fire alarm. Deferred Submittals: None. Special Inspections: Epoxy and expansion anchors, EFIS. ARCHITECTURAL COMMENTS General 1. Sheet ED1.0 indicates that the existing fire alarm is to be relocated. Does this building have a fire alarm installed? If so, please indicate that the modification of the fire alarm system will be provided as a separate submittal on the cover page. If not, please have this note removed. 2. Note on the cover of the drawings that special inspection is required for epoxy and expansion anchors. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. 3. Please indicate the ESR or Intertek testing number for the proposed E.I.F.S system. [Ref. IBC 2018 Sec. 1703.4.2] STRUCTURAL COMMENTS General 1. Please provide the structural calculations for the engineered structural design. [REF. IBC 2018 Sec. 107.1] MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS Sheet E2.0 1. Please indicate an exit sign above the work area/circulation door. [Ref. IBC 2018 Sec. 1013.1] Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
02/26/2025 | Outdoor Lighting Standard | REQUIRES RESUBMIT | February 4, 2025 1st Review Seaver Franks Architects Attn: Rick Huch/ JaMia Dees 2552 N. Alvernon Way Tucson, Arizona 85712 Re: TUCSON FEDERAL CREDIT UNION TENANT IMPROVEMENT City of Tucson Permit Number: TC-COM-0125-00150 Stantec Project Number: 185215066 Stantec File Number: TUC-24-021 Plan review for the above referenced project has been completed. This letter reflects comments to be addressed. PLEASE send all response to comments back to the City through the permit portal! Responses sent directly to Stantec will be ignored. Also, please submit complete copies of all permit documents (i.e. plans, calculations, reports, etc.) even if they have not been changed. Please cloud and delta all changes and provide a letter with a written response to each of the comments indicating the action taken. The scope of this review covers the architectural, structural, plumbing, mechanical, and electrical designs as they relate to the codes adopted by the jurisdiction. All features were checked only to the extent allowed by the submittals provided. All portions of this project are assumed to meet or will meet other departmental requirements, conditions, and concerns before permit approval. Occupancy Group Construction Type Area (Square feet) Occupant Load Automatic Fire Sprinklers Fire Alarms B V-B 3,966 45 No Yes Separate Permits: Fire alarm. Deferred Submittals: None. Special Inspections: Epoxy and expansion anchors, EFIS. ARCHITECTURAL COMMENTS General 1. Sheet ED1.0 indicates that the existing fire alarm is to be relocated. Does this building have a fire alarm installed? If so, please indicate that the modification of the fire alarm system will be provided as a separate submittal on the cover page. If not, please have this note removed. 2. Note on the cover of the drawings that special inspection is required for epoxy and expansion anchors. Also, provide City of Tucson special inspection certificate(s) with Parts A and B completed. Make sure that the owner or their legal representative signs the form. 3. Please indicate the ESR or Intertek testing number for the proposed E.I.F.S system. [Ref. IBC 2018 Sec. 1703.4.2] STRUCTURAL COMMENTS General 1. Please provide the structural calculations for the engineered structural design. [REF. IBC 2018 Sec. 107.1] MECHANICAL COMMENTS There are no comments. PLUMBING COMMENTS There are no comments. ELECTRICAL COMMENTS Sheet E2.0 1. Please indicate an exit sign above the work area/circulation door. [Ref. IBC 2018 Sec. 1013.1] Should you have any questions regarding the plan review comments, please contact the plan reviewer listed for the appropriate discipline. Plans reviewed by: Trevor Bies, Senior Plan Reviewer 602-338-9922 trevor.bies@stantec.com |
||
02/05/2025 | Fire New Construction Standard | REVIEW COMPLETED | |||
01/31/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
02/24/2025 | Site Engineering Standard | REVIEW COMPLETED |