Permit Number: TC-COM-0125-00116
Parcel: 12111364B

Review Status: In Review

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0125-00116
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: In Review
Review Date Reviewer's Name Type of Review Description Status Comments
01/31/2025 Outdoor Lighting Standard APPROVED
N/A Bldg Permits - Post Review Express PENDING ASSIGNMENT
N/A Commercial Building Standard PENDING ASSIGNMENT
N/A Site Engineering Standard PENDING ASSIGNMENT
N/A Site Zoning Standard PENDING ASSIGNMENT
01/31/2025 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0125-00116 (4711 E SPEEDWAY BL TUCSON, AZ 85712)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

1. Show compliance with NEC 690.15(A). The Disconnect Switch shall not be greater than 10’ from the service entrance and must be within sight.
2. Clarify the continuous/maximum(design) current output from the Dedicated PV Combiner Panel, PNL1. Each inverter output is rated at 47.5A(continuous)/59.4A(maximum). For 6 inverters this would produce 258A(continuous)/356.25(maximum) currents, not the 205.7A/225A shown.
3. If a current control system (PCS) is being used to limit the total current out of PNL1, provide additional notes and warning labels are required by 2023 NEC 705.13.


Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
01/22/2025 Fire New Construction Standard REVIEW COMPLETED The installation shall comply with the 2018 IFC Chapter 12 Energy Systems.
01/22/2025 PDSD Application Completeness Express REVIEW COMPLETED