Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.1
Permit Number - TC-COM-0125-00116
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
01/31/2025 | Outdoor Lighting Standard | APPROVED | |||
02/12/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
02/06/2025 | Commercial Building Standard | REQUIRES RESUBMIT | Please submit your revised documents and provide a letter with a written response letter addressing each of the comments indicating how the Review comments were resolved. Please note the submittal was incomplete and the plan review was conducted using the information presented. The subsequent review could generate more comments after original comments have been addressed. 1. Please provide a special inspection certificate with Part A, and Part B, completed with next submittal. IBC 107.2.1 https://www.tucsonaz.gov/files/sharedassets/public/v/1/city-services/planning-development-services/documents/special_inspection_certificate.pdf 2. Please amend the plans to add to the list of special inspections groups already included on the plans to provide a complete, job specific, Statement of Special Inspections. IBC 107.2.1 & IBC 1704.3.1 including. A. The type and extent of each special inspection. B. The type and extent of each test. C. Additional requirements for special inspections or tests for seismic or wind resistance as specified in Sections 1705.11, 1705.12 and 1705.13. D. For each type of special inspection, identification as to whether it will be continuous special inspection, periodic special inspection or performed in accordance with the notation used in the referenced standard where the inspections are defined. Please contact me if you have any questions about these comments. Mark Masek Plans Examiner – Building Safety Planning and Development Services | City of Tucson main 520.837.4994 email mark.masek@tucsonaz.gov |
||
01/31/2025 | Commercial Electrical Standard | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0125-00116 (4711 E SPEEDWAY BL TUCSON, AZ 85712) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Show compliance with NEC 690.15(A). The Disconnect Switch shall not be greater than 10’ from the service entrance and must be within sight. 2. Clarify the continuous/maximum(design) current output from the Dedicated PV Combiner Panel, PNL1. Each inverter output is rated at 47.5A(continuous)/59.4A(maximum). For 6 inverters this would produce 258A(continuous)/356.25(maximum) currents, not the 205.7A/225A shown. 3. If a current control system (PCS) is being used to limit the total current out of PNL1, provide additional notes and warning labels are required by 2023 NEC 705.13. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
02/12/2025 | Site Engineering Standard | REQUIRES RESUBMIT | TC-COM-0125-00116 4711 E SPEEDWAY BL Comments for Site Engineering are as follows: 1. A development package is required and must be approved by all reviewers prior to the approval of this commercial building permit. UDC Article 3.3.3.7.a Ryan Insalaco – ryan.insalaco@tucsonaz.gov |
||
02/12/2025 | Site Zoning Standard | REQUIRES RESUBMIT | FROM: PDSD Zoning Review Section PROJECT: TC-COM-0125-00116 4711 E SPEEDWAY BL. - C-2 Site Fencing (1st Review) TRANSMITTAL DATE: February 12, 2025 COMMENTS: Resubmit revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed. This site is located in the C-2 zone (UDC 4.7.21). Financial Service is an approved use in the zone (UDC Table 4.8-4), subject to Use Specific Standards 4.9.4.L.3, 4.9.13.E, and 4.9.13.P. 1. As site work is proposed per UDC Article 3.3.3.G.2.c A site plan (Development Package) is required for the following types of development: Existing development undergoing a change of use, building structure additions, and/or a reconfiguration of an area outside a building. A Development Package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
01/22/2025 | Fire New Construction Standard | REVIEW COMPLETED | The installation shall comply with the 2018 IFC Chapter 12 Energy Systems. | ||
01/22/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |