Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.1
Permit Number - TC-COM-0125-00101
Review Name: COMMERCIAL REVIEW - LIMITED v.1
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 02/06/2025 | Commercial Building | APPROVED | |||
| 01/31/2025 | Commercial Electrical | APPROVED | |||
| 02/06/2025 | Commercial Mechanical | APPROVED | |||
| 02/12/2025 | Site Zoning | APPROVED | |||
| 02/06/2025 | Water - PDSD | APPROVED | |||
| 01/31/2025 | Outdoor Lighting | NOT REQUIRED | No changes to outdoor lighting. | ||
| 02/12/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 02/06/2025 | Commercial Plumbing | REQUIRES RESUBMIT | 1. Provide metering faucets for the lavatories, dispensing a maximum of 0.25 gallons per metering cycle (e.g. 0.5 GPM for 30 seconds). Verify that the faucet cycle will last for at least 10-seconds. Reference: Section 419.6, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. Verify that the distance from the hot water source to the hot water termination for the public lavatories complies with the requirements of Section C404.5, IECC 2018 (i.e. the hot water source is within 24” of the ½” lavatory connection). |
||
| 01/29/2025 | Fire New Construction | REVIEW COMPLETED | Any alterations to the existing CO2 system requires a separate operational permit and review. | ||
| 01/29/2025 | PDSD Application Completeness Express | REVIEW COMPLETED | |||
| 02/12/2025 | Site Engineering | REVIEW COMPLETED |