Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - LIMITED v.3
Permit Number - TC-COM-0125-00092
Review Name: COMMERCIAL REVIEW - LIMITED v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 04/18/2025 | Site Zoning | APPROVED | |||
| 04/17/2025 | Water - PDSD | APPROVED | |||
| 04/07/2025 | Fire New Construction | NOT REQUIRED | |||
| 04/18/2025 | Site Engineering | NOT REQUIRED | |||
| 04/18/2025 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/18/2025 | Commercial Building | REQUIRES RESUBMIT | ACTIVITY NO. TC-COM-0125-00092 ADDRESS/PARCEL: (6137 E GRANT RD TUCSON, AZ 85712) Submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed. Please paste the review comment individually and enter your response directly below it. Please do this for every comment. Review will not proceed without the response letter. The submitted documents were incomplete and a thorough plan review could not be performed. Please be aware, new comments may arise with the next review. Should the above not followed, it may delay your approval. COMMENTS: 1. Sheet A1: Floor Plan a. LAVATORY & SINK i. Provide clear floor space for sink. ICC A117.1 606.2. Lavatories & sinks shall be 34 inches maximum above the floor, measured to the higher of the rim or counter surface per ICC A117.1 606.3 ii. Lavatory faucet operator shall also be metered. The metering faucet shall dispense a maximum of 0.25 gallons per metering cycle. Verify that the faucet cycle will last for at least 10-seconds for accessibility. Reference: Section 412.11, IPC 2018, as amended by the City of Tucson and Section 606.4, ICC/ANSI A117.1-09. 2. Provide tempered water for the lavatory using an approved device conforming to ASSE 1070. Reference: Sections 419.5 and 607.1.2, IPC 2018. b. WATER CLOSET i. At water closet, show the 60" W x 56" D clearance area on the floor per ANSI A117 Figure 604.3 Ensure no other fixtures are within this area. ii. Grab bars ICC ANSI A117.1 section 604.5, toilet and bathing facilities, grab bars and shower seat reinforcement sec 1104.11 ICC A117.1 2. Please resubmit. Should you have any questions about these comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976Should you have any questions about these comments, I can be reached at Justin.Eder@tucsonaz.gov or 520-837-4976 |
||
| 04/11/2025 | Commercial Electrical | REQUIRES RESUBMIT | Commercial Electrical Review TC-COM-0125-00092 (6137 E GRANT RD TUCSON, AZ 85712) Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received. Code reference, 2018 International Building Code (IBC), 2017 National Electrical Code (NEC). 1. Sheet A1, Floor Plan Keynote 1.5, shows a NEW electric water heater being added. Please include the water heater in the electrical plans. Update panel schedule, Electrical Floor Plan to show the circuit designation for the water heater. Update the electrical load calculations. 2. If Panelboard āCā is a sub-panel to the main service, provide electrical load calculations for the service as well, NEC 220.40. Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov |
||
| 04/17/2025 | Commercial Mechanical | REQUIRES RESUBMIT | Revise the sequence of operation of the restroom/shower room exhaust fan to operate continuously during the hours of the building operation (i.e., fan is to operate even when the lights are off). Reference: Section 403.3.1.1, IMC 2018. | ||
| 04/17/2025 | Commercial Plumbing | REQUIRES RESUBMIT | Show that the distance from the hot water source to the hot water termination for the public lavatory complies with the requirements of Section C404.5, IECC 2018. | ||
| 04/04/2025 | PDSD Application Completeness Express | REVIEW COMPLETED |