Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0124-00215
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 05/08/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 04/15/2024 | External Reviewers - SAFEBuilt | REQUIRES RESUBMIT | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 4/12/2024 9:45:59 AM Building(B) Reviewer Andrew Bevis abevis@safebuilt.com Approved Reason: Date Completed : 4/11/2024 11:22:24 AM Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Denied Reason: Date Completed : 4/10/2024 1:28:52 PM 1. (RESOLVED) Plan Sheet M1.3.1 - FCU SAD (Supply Air Drops) CFM equal 1975. Plan Sheet M4.1 - Split System Heat Pump Unit Schedule states FCU-4 Supply Air CFM is 1600. Confirm CFM for FRCU-4 - 2018 IBC Section [A]107.2.1Information on construction documents. 2. (RESOLVED) Plan Sheet M3.1 - Detail #7 - Provide direction of how refrigerant lines are run to Condenser. State if refrigerant lines are inside AHU closet wall or are in AHU closet through floor in AHU closet. - 2018 IBC Section [A]107.2.1Information on construction documents. 3. (RESOLVED) General - Provide Refrigerant piping penetration through Fire Rated assembly detail. - 2018 IBC Section [A]107.2.1Information on construction documents. 4. (UNRESOLVED) General - Provide ComCheck Mechanical Compliance Certificate - 2018 IBC Section [A]107.2.1Information on construction documents. - 2018 IECC Section 403 Building Mechanical Systems i. Mechanical Compliance Certificate - FCUs #4 and #5 details on the Mechanical Compliance Certificate do not match the SPLIT SYSTEM HEAT PUMP UNIT SCHEDULE details - 2018 IBC Section [A]107.2.1Information on construction documents. Electrical(E) Reviewer Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 4/10/2024 5:14:03 PM 1. E0.1.0 ELECTRICAL SPECIFICATIONS: Missing from set as per sheet index on sheet A0.1. Resolved. 2. E0.1.3 ELECTRICAL SITE PHOTOMETRIC SCHEDULE: Sheet not listed on sheet index on Sheet A0.1. Resolved. 3. E1.3.2 BUILDING TYPE 3 THIRD FLOOR & ROOF PLANS – POWER & SYSTEMS: Missing from set as per sheet index on sheet A0.1. Resolved. 4. E1.4.1 BUILDING TYPE 4 FIRST & SECOND FLOOR PLANS - POWER & SYSTEMS: Missing from set as per sheet index on sheet A0.1. Resolved. 5. E1.4.2 BUILDING TYPE 4 THIRD FLOOR & ROOF PLANS – POWER & SYSTEMS: Missing from set as per sheet index on sheet A0.1. Resolved. 6. E1.5.1 BUILDING TYPE 5 FIRST & SECOND FLOOR PLANS - POWER & SYSTEMS: Missing from set as per sheet index on sheet A0.1. Resolved. 7. E1.5.2 BUILDING TYPE 5 THIRD FLOOR & ROOF PLANS – POWER & SYSTEMS: Missing from set as per sheet index on sheet A0.1. Resolved. 8. E1.6.1 BUILDING TYPE 6 FIRST FLOOR & ROOF PLAN - POWER & SYSTEMS: Missing from set as per sheet index on sheet A0.1. Resolved. 9. E2.1.1 BUILDING TYPE 1 FIRST & SECOND FLOOR RCP - LIGHTING: Missing from set as per sheet index on sheet A0.1. Resolved. 10. E2.1.2 BUILDING TYPE 1 THIRD FLOOR & ROOF RCP - LIGHTING: Missing from set as per sheet index on sheet A0.1. Resolved. 11. E2.2.1 BUILDING TYPE 2 FIRST & SECOND FLOOR RCP - LIGHTING: Missing from set as per sheet index on sheet A0.1. Resolved. 12. E2.2.2 BUILDING TYPE 2 THIRD FLOOR & ROOF RCP - LIGHTING: Missing from set as per sheet index on sheet A0.1. Resolved. 13. E2.3.1 BUILDING TYPE 3 FIRST & SECOND FLOOR RCP - LIGHTING: Missing from set as per sheet index on sheet A0.1. Resolved. 14. E2.3.2 BUILDING TYPE 3 THIRD FLOOR & ROOF RCP - LIGHTING: Missing from set as per sheet index on sheet A0.1. Resolved. 15. E2.4.1 BUILDING TYPE 4 FIRST & SECOND FLOOR RCP - LIGHTING: Missing from set as per sheet index on sheet A0.1. Resolved. 16. E2.4.2 BUILDING TYPE 4 THIRD FLOOR & ROOF RCP - LIGHTING: Missing from set as per sheet index on sheet A0.1. Resolved. 17. E2.5.1 BUILDING TYPE 5 FIRST & SECOND FLOOR RCP - LIGHTING: Missing from set as per sheet index on sheet A0.1. Resolved. 18. E2.5.2 BUILDING TYPE 5 THIRD FLOOR & ROOF RCP - LIGHTING: Missing from set as per sheet index on sheet A0.1. Resolved. 19. E2.6.1 BUILDING TYPE 6 FIRST FLOOR RCP - LIGHTING: Missing from set as per sheet index on sheet A0.1. Resolved. 20. E3.A.A UNIT A(A) ELECTRICAL PLANS: Sheet is E2.A in submittal. Resolved. 21. E3.A.B UNIT A(B) ELECTRICAL PLANS: Sheet is not in submittal. Resolved. 22. E3.B.A UNIT B(A) ELECTRICAL PLANS: Sheet is E2.B in submittal. Resolved. 23. E3.B.B UNIT B(B) ELECTRICAL PLANS: Sheet is not in submittal. Resolved. 24. E3.C.A UNIT C(A) ELECTRICAL PLANS: Sheet is E2.C in submittal. Resolved. 25. E3.C.B UNIT C(B) ELECTRICAL PLANS: Sheet is not in submittal. Resolved. 26. E3.D.A UNIT D(A) ELECTRICAL PLANS: Sheet is not in submittal. Resolved. 27. E3.D.B UNIT D(B) ELECTRICAL PLANS: Sheet is not in submittal. Resolved. 28. E4.1.1 ELECTRICAL ONE-LINE DIAGRAMS: Sheet is E3.1 in submittal Resolved. 29. E4.2.1 ELECTRICAL ONE-LINE DIAGRAMS: Sheet is E3.2 in submittal Resolved. 30. Sheet is E3.3 in submittal Resolved. 31. E4.3.1 ELECTRICAL ONE-LINE DIAGRAMS:Detail 2 shows 3 phase SES enclosures, but panels EV-1 and EV-2 are single phase. Resolved. 32. E5.1.1 ELECTRICAL SCHEDULES: Sheet is E4.1 in submittal Resolved. 33. E5.2.1 ELECTRICAL SCHEDULES: Sheet is not in submittal. Resolved. 34. E5.3.1 ELECTRICAL SCHEDULES: Sheet is not in submittal. Resolved. 35. E5.4.1 ELECTRICAL SCHEDULES: Sheet is not in submittal. Resolved. 36. E6.1.1 ELECTRICAL DETAILS: Sheet is E5.1 in submittal Resolved Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Denied Reason: Date Completed : 4/14/2024 11:17:03 PM Second Plumbing Review: Comment 6 remains Resolved 1). Plan pages A08.1, A08.2, A08.3 need to include Primary/Secondary scupper & downspout sizes along with sizing calculations.-2018 IPC 1106.1, 1106.3, 1108 Resolved 2). Waste stack vents 2, 7, 11 on plan page P3.1 need to remain 3" thru roof level-2018 IPC 913..3, 913.4 Resolved 3). Sanitary stacks 3, & 9 on plan page P3.1 are not vented properly- 2018 IPC 901.2.1 Resolved 4). P1.1.2, P1.2.2 need to include Primary/ secondary scupper sizes & sizing calculations. -2018 IPC 1101.7, 1108 Resolved 5), Add sanitary Building drain sizes to plan page P1.1.1 -2018 IPC 710.1 Un-resolved 6). Plan set missing civil utility & Landscape pages as listed on plan page A0.1, -2018 IPC 106.3.1 Resolved 7). Add Plumbing fixture manufacturer name & Model numbers to plan page P5.1 -2018 IPC 30 |
||
| 05/08/2024 | Site Engineering | REQUIRES RESUBMIT | See zoning comment | ||
| 05/08/2024 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: PDSD Zoning Review PROJECT: TC-COM-0124-00215, C-COM-0224-00270, TC-COM-0224-00271 & TC-COM-0224-00272 - TD-DEV-0124-00025 6163 S MIDVALE PARK RD. (1st Review) Multifamily (2nd Review) TRANSMITTAL: May 8, 2024 COMMENTS: Provide revised drawings along with a detailed response letter, which states how all Zoning Review Section comments were addressed with your next submittal. This site is located in the R-2 zone (UDC 4.7.9). a multifamily use is a permitted use in this zone (Table 4.8-2), subject to Use Specific Standards 4.9.7.B.6, .9, & .10 1. Zoning has reviewed the building plans for compliance with development package (DP) TD-DEV-0124-00025 and although it appears that the plans match until the DP is approved by all review agencies Zoning cannot approve the building plans. 2. Per UDC Article 6.4.4.A Measurement of Building Height, building height is the vertical distance measured from the design grade elevation to the highest point of a flat roof. As height dimensions from design grade were not provided Zoning cannot verify if the proposed building exceeds the allowed 25’-0” height, UDC Table 6.3-2.A. 3. Per UDC Article 6.4.4.C.5 parapet walls shall not exceed the allowable height by more than four feet. Clearly demonstrate that this requirement is met. If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov. |
||
| 04/09/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |