Permit Review Detail
Review Status: Requires Resubmit
Review Details: COMMERCIAL FENCE/WALL v.2
Permit Number - TC-COM-0124-00178
Review Name: COMMERCIAL FENCE/WALL v.2
Review Status: Requires Resubmit
| Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
|---|---|---|---|---|---|
| 08/21/2024 | Commercial Building | APPROVED | |||
| 08/21/2024 | Bldg Permits - Post Review Express | PENDING ASSIGNMENT | |||
| 08/20/2024 | Commercial Electrical | REQUIRES RESUBMIT | Please address the electrical plan review comments and provide a written response. 1 Show the locations of the new panels marked ‘G’ and the panels marked ‘A’, ‘B’ South and North on the electrical site plan. 2 How are the new panels marked ‘G’ associated with the Gate Operators? 3 The panel schedules shown, ‘A’, ‘B’ South, and ‘A’, ‘B’ North are not shown on the electrical line diagram. Please clarify as to why the breaker panels shown in the electrical plans all have different identification marks and show correlation between them and the existing electrical service equipment and the gate operators. 4 Show the branch circuit conduit, conductor sizes and types that feed the Gate operators on the electrical plans. 5 Provide and show the disconnecting means for the Gate Operators or Controllers. 6 Why do the load calculations only show panel ‘A’ South and Panel ‘A’ North? Also include load calculations for panel ‘B’ South and panel ‘B’ North. 7 Why are there no panel schedules for the Panels Marked ‘F1’ and ‘G’ Noth and South? 8 Please Provide electrical plans, design and calculations performed by an Arizona registrant who has demonstrated proficiency through registration, education, technical knowledge, or experience to perform such work. Ref; 2018 IBC section 107.2.1, 2017 NEC, City of Tucson Commercial Plan Submittal Requirements. |
||
| 08/19/2024 | Site Zoning | REQUIRES RESUBMIT | ZONING REVIEW TRANSMITTAL FROM: Wyatt Berger Lead Planner PROJECT: TC-COM-0124-00178 2505 North Dodge Boulevard – R-2 Entry access gates (2nd Review) TRANSMITTAL DATE: August 19, 2024 The site is in the R-2 zone (UDC 4.7.9). Multifamily development is a permitted use in the R-2 zone, subject to use-specific standards 4.9.7.B.6, .9, and .10. 1. This comment was not addressed. Per UDC 3.3.3.G.2.c, a site plan (development package) is required for any existing development undergoing a change of use, building or structure additions, and/or a reconfiguration of an area outside a building. A separate development package that meets the Checklist for Minor Development Changes to Existing Commercial/Industrial Sites is required to be submitted and approved prior to Zoning approval of TC-COM-0124-00178. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf. If you have any questions about this transmittal, contact me at Wyatt.Berger@tucsonaz.gov or at 520-837-4951. RESUBMITTAL OF THE FOLLOWING IS REQUIRED: A revised plan set as well as a comment response letter. To resubmit, visit the Tucson Development Center Online at https://tdc-online.tucsonaz.gov/#/home. The instructions for resubmittal can be found at https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/tdc-faq/new-pdfs/revisions-and-resubmittals.pdf. |
||
| 08/07/2024 | PDSD Application Completeness Express | REVIEW COMPLETED |