Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0124-00156
Parcel: 133141800

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0124-00156
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
02/21/2024 Commercial Electrical NOT REQUIRED
02/27/2024 Commercial Plumbing NOT REQUIRED
01/29/2024 Fire New Construction NOT REQUIRED
02/27/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
02/27/2024 Commercial Mechanical REQUIRES RESUBMIT Provide construction documents sealed by an Arizona Registrant with sufficient detail and clarity to demonstrate that the work complies with the applicable codes. Reference: Section 107.2.1, IBC 2018, Section 1402, IMC 2018, and Arizona Revised Statutes 32-125, Board of Technical Registration Rules R4-30-304.
02/23/2024 Commercial Structural REQUIRES RESUBMIT Please submit your revised drawings along with a detailed response letter, which states how all Building Review Section comments were addressed.

1. Please have construction documents prepared by an Arizona licensed registrant as required by City of Tucson Commercial Submittal Requirements. The link is : https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/checklists/commercial_submittal_requirements_july2023.pdf

2. The submitted drawings were largely incomplete and lacking sufficient detail for a complete plan review. Please provide for review, a complete Set of Plans In accordance with SECTION 107 of the 2018 IBC and the PDSD Building Plan Requirements, 2023 complete set of fully dimensioned plans demonstrating the full scope of work shall be provided. All plans must be sealed and signed by an Architect or Engineer registered in the State of Arizona. Note. The term ‘building plans’ may refer to structural, electrical, plumbing, or any other trade regulated by the associated suite of codes adopted by the City of Tucson.

3. The plans will include a site plan, dimensioned building plan, all materials used, fastening and connection details, roof loads and roof evaluation and method of uplift resistance. IBC 107.2.1

Mark Masek

Plans Examiner

Mark.masek@tucsonaz.gov

520-837-4994
02/16/2024 Site Engineering REQUIRES RESUBMIT See zoning comment
02/08/2024 Site Zoning REQUIRES RESUBMIT ZONING REVIEW TRANSMITTAL

FROM: PDSD Zoning Review

PROJECT:
TC-COM-0124-00156
1670 N PASEO DORADO. O-3
Add solar collector to existing spa heater system. (1st Review)

TRANSMITTAL: February 8, 2024
This site is located in the O-3 zone (UDC 4.7.15). A residential subdivision w/amenities: is a permitted use in this zone (Table 4.8-3).

1. Provide a plan that clearly shows where the solar panel will be located. If this is a ground mounted unit a development package (DP) meeting the requirements of the Checklist for Minor Changes to Commercial/Industrial Sites is required to be submitted and approved. The DP is a separate submittal from the building plans. The checklist can be found at: https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/minor_changes_to_commercial_industrial_sites_.pdf.

If you have any questions about this transmittal, please contact Zone1.desk@tucsonaz.gov.
01/24/2024 PDSD Application Completeness Express REVIEW COMPLETED