Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit Review Detail
Review Status: Approved
Review Details: COMMERCIAL REVIEW - FULL v.3
Permit Number - TC-COM-0124-00148
Review Name: COMMERCIAL REVIEW - FULL v.3
Review Status: Approved
Review Date | Reviewer's Name | Type of Review | Description | Status | Comments |
---|---|---|---|---|---|
03/26/2024 | Bldg Permits - Post Review | REVIEW COMPLETED | |||
03/26/2024 | External Reviewers - SAFEBuilt | REVIEW COMPLETED | Structural(S) Reviewer Madeline Nelson mnelson@safebuilt.com Approved Reason: Date Completed : 3/22/2024 1:58:15 PM Building(B) Reviewer Keith Miller kmiller@safebuilt.com Approved Reason: Date Completed : 3/22/2024 11:38:17 AM The building review is approved. Subject to the field inspector's approval. Mechanical(M) Reviewer Jorge Valido jvalido@safebuilt.com Approved Reason: Date Completed : 3/25/2024 4:55:02 PM 1. General - Provide Ventilation Calculation/Schedule - 2018 IMC Section Table 403.3.1.1 (RESOLVED) Electrical(E) Reviewer (from previous submittal TUC9520001.012924) Ron Ross rross@safebuilt.com Approved with Comments Reason: Date Completed : 1/30/2024 1:39:37 PM Electrical Review of Tucson Commerce Center By: Ron Ross PE DMEP.1B Overall MEP Plan - Demolition: Could not locate Keyed Notes 3, 4, and 5. E2.13B Overall / Enlarged Plan - Power: Could not locate Keyed Note 6. E3.01B Electrical Schedules: RTU-3 and RTU-4 have undersized circuit breakers and conductors for the loads shown in Panelboard schedule. Should correct loads shown as Mechanical sheet M2.01B does show 70 amp Circuit breakers as correct. Should confirm, coordinate, and correct for IFC set. If 70 amp Circuit Breakers need to be upsized, resubmit with properly sized conductors. Plumbing(P) Reviewer Perry Hendershott phendershott@safebuilt.com Approved Reason: Date Completed : 3/23/2024 2:46:08 PM Second Plumbing Review: OK RERSOLVED-1). Need to address Bldg. plan review Comment 1 -2018 IPC 404.2 |
||
03/21/2024 | PDSD Application Completeness | REVIEW COMPLETED |