Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Number: TC-COM-0124-00130
Parcel: 10925038A

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.2

Permit Number - TC-COM-0124-00130
Review Name: COMMERCIAL REVIEW - FULL v.2
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/27/2024 Site Zoning APPROVED
03/18/2024 Site Engineering NOT REQUIRED
03/28/2024 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/25/2024 Commercial Electrical REQUIRES RESUBMIT Please address the electrical plan review comments and provide a written response.
1 The branch circuits #'s and or feeders assigned to the mechanical units do not correlate with the panel schedules. NEC 408.4. Please clarify
2018 IBC section 107.2.1, 2017 NEC
03/28/2024 Commercial Mechanical REQUIRES RESUBMIT 1. Revise the design criteria (P1-M0.01) to show the elevation and temperature conditions for Tucson, Arizona, not Phoenix, Arizona.
2. Revise the General Notes (P1-M0.01) the display the codes applicable to the City of Tucson (e.g. not 2021 IMC, 2012 IMC, or ICC Electrical Code).
3. Clarify which of the three units (FC-OR, FC-SPD, and FC-PRE) should be labeled as fan coils or as blower coils. Reference: Section 107.2.1, IBC 2018.
4. Clarify the location of the humidifier. Sheets P1-M2.15, P1-M8.01, and P1-P2.12 show the unit at a remote location on the roof but detail 6/P1-M7.01 implies that the humidifier is located below the duct from FC-OR. Show how the steam condensate is drained and where the drain terminates. (Note that the manufacturer calls for the unit to be located where the ambient temperature is a maximum of 86 degrees Fahrenheit.)
5. Provide heating and cooling load calculations to justify the heating/cooling capacities of the specified HVAC units. Reference: Section C403.1.1 and C403.3.1, IECC 2018.
6. Provide structural details to show how the fan coil units are to be connected to the building structure. Reference: Section 302.1, IMC 2018.
7. Show the size, routing, and termination of the condensate drain for the splitIU-1. Reference: Section 307.2.1, IMC 2018 as amended by the City of Tucson.
8. Provide calculations to verify that adequate ventilation will be provided for the spaces served by HP-4. Reference: Section 403.3.1.1, IMC 2018.
9. Provide calculations to verify that adequate ventilation will be provided for the spaces served by FC-OR, FC-SPD, and FC-PRE per ASHRAE Standard 170-2017. Reference: Section 407.1, IMC 2018.
03/28/2024 Commercial Plumbing REQUIRES RESUBMIT 1. Revise the design criteria (P1-P0.01) to show the latitude and elevation for Tucson, Arizona, not Phoenix, Arizona.
2. Provide a detail showing the plumbing connections to the humidifier. The detail shall include the valves, strainer, and water hammer arrestor, per the manufacturer’s installation instructions. Reference: Sections 303.2, 604.9, and 606.2, IPC 2018.
3. Provide backflow protection for the potable water connection to the humidifier. Reference: Section 608.17.10, IPC 2018.
03/28/2024 Commercial Structural REQUIRES RESUBMIT Please provide sheet A2.44E as referenced in Demo Plan call out. IBC 107.2.1
03/18/2024 Fire New Construction REVIEW COMPLETED