Permit Number: TC-COM-0124-00125
Parcel: 11505046B

Address:
109 W GRANT RD

Review Status: Requires Resubmit

Review Details: COMMERCIAL REVIEW - FULL v.1

Permit Number - TC-COM-0124-00125
Review Name: COMMERCIAL REVIEW - FULL v.1
Review Status: Requires Resubmit
Review Date Reviewer's Name Type of Review Description Status Comments
03/11/2025 Site Zoning Standard APPROVED
03/12/2025 Water - PDSD Standard APPROVED
03/12/2025 Commercial Building Standard NOT REQUIRED
03/12/2025 Commercial Mechanical Standard NOT REQUIRED
03/12/2025 Commercial Plumbing Standard NOT REQUIRED
03/12/2025 Bldg Permits - Post Review Express PENDING ASSIGNMENT
03/05/2025 Commercial Electrical Standard REQUIRES RESUBMIT Commercial Electrical Review TC-COM-0124-00125 (109 W GRANT RD TUCSON, AZ 85705)
Plan review for the above referenced structure has been completed. This letter reflects comments to be addressed. Provide updated Plans/calculations and a written response Letter to each of the notated items indicating action taken. Resubmitted plans that do not contain a written response Letter addressing each of the notated items indicating action taken, may be delayed until response letter is received.
Code reference, 2018 International Residential Code (IRC), 2018 International Building Code (IBC), 2017 National Electrical Code (NEC).

1. Provide an updated panel schedule, showing the circuits that are being modified, added or removed. NEC arts;300 and 408.4. Clearly mark existing loads/circuits and those being modified or added to.
2. Designate the circuit number, that corresponds to the panel schedule, at the location of each new or modified light fixture, receptacle, appliance, and equipment disconnect switch, NEC arts;300 and 408.4.

Contact Jeremy Hamblin with any questions: Jeremy.hamblin@tucsonaz.gov
02/27/2025 Fire New Construction Standard REVIEW COMPLETED
02/19/2025 PDSD Application Completeness Express REVIEW COMPLETED